home
Home
code
Code
Code
Index
law
Laws (4)
New Laws (4)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Township of Harris, PA
chevron_right
2023-03-13
info
chevron_right
MUNICIPAL CODE
chevron_right
Chapter 13 Stormwater Management
MUNICIPAL CODE
Ch AO
Adopting Ordinance
Ch 1
Administration and Government
Ch 2
Taxation
Ch 3
Licenses and Permits
Ch 4
(Reserved)
Ch 5
Health and Safety
Ch 6
Public Safety and Conduct
Ch 7
Streets and Sidewalks
Ch 8
Motor Vehicles and Traffic
Ch 9
Sewers
Ch 10
Construction Codes
Ch 11
Subdivision and Land Development
Ch 12
Zoning
Ch 13
Stormwater Management
Ch 13 Art I
General Provisions
§ 13-1.1
Findings.
§ 13-1.2
Purpose.
§ 13-1.3
Statutory authority.
§ 13-1.4
Applicability; regulated activities.
§ 13-1.5
Compatibility with other requirements.
§ 13-1.6
Landowner responsibility.
§ 13-1.7
References to specific methods and publications.
§ 13-1.8
Exemptions.
§ 13-1.9
Municipal liability.
§ 13-1.10
Erroneous approval.
Ch 13 Art II
Terminology
§ 13-2.1
Word usage.
§ 13-2.2
Definitions.
Ch 13 Art III
Stormwater Management Requirements
§ 13-3.1
General requirements.
§ 13-3.2
Sensitive areas and developments.
§ 13-3.3
Performance standards.
§ 13-3.4
Calculation methodologies.
§ 13-3.5
Erosion and sedimentation control requirements.
§ 13-3.6
Sinkhole protection.
§ 13-3.7
Design criteria for stormwater management facilities.
§ 13-3.8
Easements.
§ 13-3.9
Prohibited discharges and connections.
Ch 13 Art IV
SWM Site Plan Requirements
§ 13-4.1
General requirements.
§ 13-4.2
Plan contents.
§ 13-4.3
Plan submission.
§ 13-4.4
Plan review.
§ 13-4.5
Modification of plans.
§ 13-4.6
Resubmission of disapproved plans.
Ch 13 Art V
Inspections
§ 13-5.1
Schedule of inspections.
Ch 13 Art VI
Fees and Expenses
§ 13-6.1
Required fees.
§ 13-6.2
Fee schedule.
§ 13-6.3
Expenses covered by fees.
Ch 13 Art VII
Operation and Maintenance Requirements
§ 13-7.1
Stormwater management controls and facilities.
§ 13-7.2
Performance guarantee.
§ 13-7.3
Maintenance responsibilities.
§ 13-7.4
Declaration of stormwater access and maintenance easement for privately owned stormwater facilities.
§ 13-7.5
Post-construction maintenance inspections.
Ch 13 Art VIII
Enforcement and Penalties
§ 13-8.1
Right of entry.
§ 13-8.2
Notice of violation.
§ 13-8.3
Enforcement.
§ 13-8.4
Public nuisance.
§ 13-8.5
Violations and penalties.
§ 13-8.6
Appeals.
DISPOSITION LIST
Ch DL
Disposition List
arrow_back
print
Print
email
Email
download
Download
share
Share
add_alert
Get Updates
arrow_forward
Chapter 13
Stormwater Management
[HISTORY: Adopted by the Board of Supervisors of the Township of Harris
8-11-2014
by
Ord. No. 313
. Amendments noted where applicable.]
GENERAL REFERENCES
Sewers — See Ch.
9
.
Subdivision and land development — See Ch.
11
.
Zoning — See Ch.
12
.
ATTACHMENTS
Attachment 1 - Appendix A, Stormwater Management Design Charts and Tables
Attachment 2 - Appendix B, Watershed Maps
Attachment 3 - Sensitive Land Areas for Well Head Protection Data Source
Article I
General Provisions
chevron_right
§ 13-1.1
Findings.
chevron_right
§ 13-1.2
Purpose.
chevron_right
§ 13-1.3
Statutory authority.
chevron_right
§ 13-1.4
Applicability; regulated activities.
chevron_right
§ 13-1.5
Compatibility with other requirements.
chevron_right
§ 13-1.6
Landowner responsibility.
chevron_right
§ 13-1.7
References to specific methods and publications.
chevron_right
§ 13-1.8
Exemptions.
chevron_right
§ 13-1.9
Municipal liability.
chevron_right
§ 13-1.10
Erroneous approval.
chevron_right
Article II
Terminology
chevron_right
§ 13-2.1
Word usage.
chevron_right
§ 13-2.2
Definitions.
chevron_right
Article III
Stormwater Management Requirements
chevron_right
§ 13-3.1
General requirements.
chevron_right
§ 13-3.2
Sensitive areas and developments.
chevron_right
§ 13-3.3
Performance standards.
chevron_right
§ 13-3.4
Calculation methodologies.
chevron_right
§ 13-3.5
Erosion and sedimentation control requirements.
chevron_right
§ 13-3.6
Sinkhole protection.
chevron_right
§ 13-3.7
Design criteria for stormwater management facilities.
chevron_right
§ 13-3.8
Easements.
chevron_right
§ 13-3.9
Prohibited discharges and connections.
chevron_right
Article IV
SWM Site Plan Requirements
chevron_right
§ 13-4.1
General requirements.
chevron_right
§ 13-4.2
Plan contents.
chevron_right
§ 13-4.3
Plan submission.
chevron_right
§ 13-4.4
Plan review.
chevron_right
§ 13-4.5
Modification of plans.
chevron_right
§ 13-4.6
Resubmission of disapproved plans.
chevron_right
Article V
Inspections
chevron_right
§ 13-5.1
Schedule of inspections.
chevron_right
Article VI
Fees and Expenses
chevron_right
§ 13-6.1
Required fees.
chevron_right
§ 13-6.2
Fee schedule.
chevron_right
§ 13-6.3
Expenses covered by fees.
chevron_right
Article VII
Operation and Maintenance Requirements
chevron_right
§ 13-7.1
Stormwater management controls and facilities.
chevron_right
§ 13-7.2
Performance guarantee.
chevron_right
§ 13-7.3
Maintenance responsibilities.
chevron_right
§ 13-7.4
Declaration of stormwater access and maintenance easement for privately owned stormwater facilities.
chevron_right
§ 13-7.5
Post-construction maintenance inspections.
chevron_right
Article VIII
Enforcement and Penalties
chevron_right
§ 13-8.1
Right of entry.
chevron_right
§ 13-8.2
Notice of violation.
chevron_right
§ 13-8.3
Enforcement.
chevron_right
§ 13-8.4
Public nuisance.
chevron_right
§ 13-8.5
Violations and penalties.
chevron_right
§ 13-8.6
Appeals.
chevron_right