Design requirements. The size, slope, alignment, and materials of
construction of building water lines and the methods to be used in
excavating, placing of the pipe, jointing, testing, backfilling and
compacting the trench shall all conform to the requirements of the
building and plumbing code or other applicable rules and regulations
of the City and state.