[Ord. No. 2022-01, 7/12/2022]
The applicant shall provide a financial guarantee to the Township for the timely installation and proper construction of all erosion and sediment control measures and stormwater management BMPs as required by the approved stormwater management plan and this Part equal to the full construction cost of the required controls plus construction contingency and construction inspection costs.
[Ord. No. 2022-01, 7/12/2022]
A. 
The stormwater management plan for the development site shall contain a BMP operation and maintenance plan (BMP O&M) prepared by the design engineer. The operation and maintenance plan shall outline required routine maintenance actions and schedules necessary to ensure proper operation of the BMPs and shall be subject to review and approval of the Township.
B. 
The BMP O&M plan for the development site shall establish responsibilities for the continuing operation and maintenance of all proposed stormwater control facilities, consistent with the following principles:
(1) 
If a development consists of structures or lots that are to be separately owned and in which streets, storm sewers, and other stormwater management improvements are to be dedicated to the Township, stormwater BMPs may also be dedicated to and maintained by the Township, if accepted by the Township.
(2) 
If a development site is to be maintained in a single ownership or if storm sewers and other stormwater management improvements are to be privately owned and maintained, then the ownership and maintenance of stormwater BMPs shall be the responsibility of the owner or private management entity.
C. 
The stormwater facility and BMP O&M plan shall include the following:
(1) 
Description of how each stormwater facility and BMP will be operated and maintained, and the identity and contact information associated with the person(s) responsible for O&M.
(2) 
Name of the project site, name and address of the owner of the property, and name of the individual or firm preparing the plan.
(3) 
A statement, signed by the facility owner, acknowledging that the stormwater facilities and BMPs are fixtures that can be altered or removed only after approval by the Township.
D. 
Facilities, areas, or structures used as BMPs shall be enumerated as permanent real estate appurtenances and recorded as deed restrictions or conservation easements that run with the land.
E. 
The O&M plan shall be recorded as a restrictive deed covenant that runs with the land.
F. 
The Board of Supervisors, upon recommendation of the Township Engineer, shall make the final determination on the continuing maintenance responsibilities prior to final approval of the stormwater management plan. The Board of Supervisors reserves the right anytime to accept the ownership and operating responsibility for any or all of the stormwater BMPs. The right of the Township to accept ownership in the future shall be stated in the maintenance agreement (refer to § 26-164).
[Ord. No. 2022-01, 7/12/2022]
A. 
The Township shall review the stormwater facilities and BMP O&M plan for consistency with the purposes and requirements of this Part, and any permits issued by PADEP.
B. 
The Township shall notify the applicant in writing whether the stormwater facility and BMP O&M plan is approved.
C. 
The Township shall require a record drawing of all stormwater facilities and BMPs.
[Ord. No. 2022-01, 7/12/2022]
A. 
Prior to final approval of the site's stormwater management plan, the applicant shall sign and record an O&M agreement prepared and approved by the Township Solicitor covering all stormwater control facilities that are to be privately owned. The form and substance of the agreement shall be consistent with the agreement in Appendix K of this Part.[1]
[1]
Editor's Note: Appendix K is included as an attachment to this chapter.
B. 
Other items may be included in the O&M agreement where determined necessary to guarantee the satisfactory maintenance of all facilities. The O&M agreement shall be subject to review and approval of the Township.
C. 
The owner is responsible for the O&M of the SWM BMPs. If the owner fails to adhere to the O&M agreement, the Township may perform the services required and charge the owner appropriate fees. Nonpayment of fees may result in a lien against the property.
[Ord. No. 2022-01, 7/12/2022]
A. 
Stormwater management easements shall be provided by the property owner if necessary for: 1) access for facility inspections and maintenance, or 2) preservation of stormwater runoff conveyance, infiltration, and detention areas and facilities, including flood routes for the 100-year storm event. The purpose of the easement shall be specified in the maintenance agreement signed by the property owner.
B. 
Stormwater management easements are required for all areas used for off-site stormwater control, unless a waiver is granted by the Township.
C. 
Easements shall be recorded with the Bucks County Recorder of Deeds prior to issuance of a building permit or recordation of a subdivision or land development plan.
[Ord. No. 2022-01, 7/12/2022]
A. 
If stormwater BMPs are accepted by the Township for dedication, persons installing stormwater BMPs shall be required to pay a specified amount to the Township Stormwater Maintenance Fund to help defray costs of periodic inspections and maintenance expenses. The amount of the deposit shall be determined as follows:
(1) 
If the BMP is to be owned and maintained by the Township, the deposit shall cover the estimated costs for maintenance and inspections required pursuant to § 26-167 for 10 years. The Township Engineer will establish the estimated costs upon review of information submitted by the applicant.
(2) 
If the stormwater management facilities and best management practices are to be owned and maintained by a private entity, the deposit shall cover the estimated costs for maintenance and inspections for 10 years. The Township Engineer will establish the estimated costs upon review of information submitted by the applicant.
(3) 
The amount of the deposit to the fund shall be converted to present worth of the annual series of payments. The Township Engineer shall determine the present worth equivalents, which shall be subject to the approval of the Board of Supervisors.
B. 
If a BMP is proposed that also serves as a recreation facility (e.g., ballfield, pond), the Township may, but is not required to, reduce or waive the amount of the maintenance fund deposit based upon the value of the land for public recreation purposes.
C. 
A financial deposit to the Township Stormwater Management Fund shall be required to be paid by the developer to help defray costs of periodic inspections and maintenance expenses associated with all stormwater management facilities, storm sewers, culverts, and other such improvements required by PennDOT, to be constructed within the right-of-way of public roadways, that are to be maintained after dedication by the Township. The deposit shall cover the estimated cost for maintenance and inspections for 10 years. The Township Engineer will establish the estimated cost upon review of information submitted by the applicant.
[Ord. No. 2022-01, 7/12/2022]
A. 
BMPs shall be inspected by the landowner/developer or responsible entity (including the Township Engineer for dedicated BMPs) on the following basis:
(1) 
Twelve months after completion of the facility and acceptance by the Township.
(2) 
At least once every three years thereafter.
(3) 
During or immediately after the cessation of a 100-year or greater storm event.
B. 
The entity conducting the inspection shall submit a report to the Township regarding necessary repairs, if any.