[Ord. No. 1358, 9/12/2022]
Fees shall be established by the Borough to cover plan review and construction inspection costs incurred by the Borough. All fees shall be paid by the applicant at the time of SWM site plan submission. A review and inspection fee schedule shall be established by resolution of the municipal governing body based on the size of the regulated activity and based on the Borough's costs for reviewing SWM site plans, conducting inspections pursuant to § 26-227, and reviewing as-built plans pursuant to § 26-228. The Borough shall periodically update the review and inspection fee schedule to ensure that review costs are adequately reimbursed.
[Ord. No. 1358, 9/12/2022]
1. 
The fees required by this Part (unless otherwise waived by the Borough) shall, at a minimum, cover:
A. 
Administrative costs and clerical processing.
B. 
Attendance at meetings.
C. 
The review of the SWM site plan by the Borough.
D. 
The review of operations and maintenance responsibilities and agreements, including financial guarantees.
E. 
The review of as-built plans.
F. 
The inspection of SWM facilities and drainage improvements during construction.
G. 
The final inspection at the completion of the construction of the SWM facilities and drainage improvements presented in the SWM site plan.
H. 
Any additional work required to enforce any permit provisions regulated by this Part, correct violations, and assure proper completion of stipulated remedial actions.