[HISTORY: Adopted by the Town Meeting of the Town of Abington as indicated in article histories. Amendments noted where applicable.]
[Adopted 10-19-2020 ATM by Art. 15]
A. 
The purpose of this Bylaw is to establish minimum stormwater management requirements and procedures in order to minimize damage to public and private property and infrastructure; safeguard the public health, safety, environment and general welfare; protect aquatic resources and wildlife habitat; protect the quality and health of water resources; conserve groundwater supplies; and, foster climate change resiliency.
B. 
This Bylaw seeks to meet that purpose through the following objectives:
(1) 
Establish the Town of Abington as the legal authority to ensure compliance with the provisions of this Bylaw and its accompanying Rules and Regulations through a review process, inspections, monitoring, and enforcement;
(2) 
Establish administrative procedures for: the submission, review, and approval or disapproval of Stormwater Management Permits; the inspection of approved active projects; and post-construction monitoring;
(3) 
Establish decision-making processes surrounding new development and redevelopment that protect watershed integrity and preserve and/or restore the health of local water resources such as lakes, ponds, streams, rivers, wetlands, and groundwater; and
(4) 
Ensure compliance with requirements of the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges from Small Municipal Separate Storm Sewer Systems (MS4) and other applicable state and federal mandates.
For the purposes of this Bylaw, the following shall mean:
AGRICULTURAL USE
The normal maintenance or improvement of land in agricultural or aquacultural use, as defined by the Massachusetts Wetlands Protection Act, M.G.L. c. 131, § 40, and its implementing regulations.
APPLICANT
Any person, individual, partnership, association, firm, company, corporation, trust, authority, agency, department, or political subdivision, of the Commonwealth of Massachusetts or the federal government to the extent permitted by law requesting a soil erosion and sediment control permit for proposed land-disturbance activity.
BEST MANAGEMENT PRACTICE (BMP)
An activity, procedure, restraint, or structural improvement that helps reduce the quantity or improve the quality of stormwater runoff.
CERTIFICATE OF COMPLETION
Document issued by the Stormwater Permitting Authority upon receipt of a final inspection report and acknowledgement that all conditions of the Stormwater Management Permit have been satisfactorily completed.
CERTIFIED PROFESSIONAL IN EROSION AND SEDIMENT CONTROL (CPESC)
A certified specialist in soil erosion and sediment control. This certification program, sponsored by the Soil and Water Conservation Society in cooperation with the American Society of Agronomy, provides the public with evidence of professional qualifications.
ENFORCEMENT ORDER
A written order issued by the Stormwater Permitting Authority to enforce the provisions of this Bylaw.
MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) or MUNICIPAL STORM DRAIN SYSTEM
The system of conveyances designed or used for collecting or conveying stormwater, including any road with a drainage system, street, gutter, curb, inlet, piped storm drain, pumping facility, retention or detention basin, natural or man-made or altered drainage channel, reservoir, and other drainage structure that together comprise the storm drainage system owned or operated by the Town of Abington, MA.
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORMWATER DISCHARGE PERMIT
A permit issued by the EPA or jointly with the Commonwealth of Massachusetts that authorizes the discharge of stormwater to waters of the United States.
NEW DEVELOPMENT
Any construction, land alteration, or addition of impervious surfaces on previously undeveloped sites resulting in a total disturbance of land equal to or greater than one acre (or activities that are part of a larger common plan of development disturbing greater than one acre) that does not meet the definition of redevelopment.
OWNER
A person with a legal or equitable interest in property.
PERSON
An individual, partnership, association, firm, company, trust, corporation, agency, authority, department or political subdivision of the Commonwealth of Massachusetts or the federal government, to the extent permitted by law, and any officer, employee, or agent of such person.
PROFESSIONAL ENGINEER (P.E.)
A registered Professional Engineer within the Commonwealth of Massachusetts in good standing.
REDEVELOPMENT
Development, rehabilitation, expansion, demolition, or phased projects that disturb the ground surface or increase the impervious area on previously developed sites. Any construction, land alteration, or improvement of impervious surfaces resulting in total disturbance of land equal to or greater than one acre (or activities that are part of a larger common plan of redevelopment disturbing greater than one acre) that does not meet the definition of New Development.
STORMWATER
Stormwater runoff, snow melt runoff, and surface water runoff and drainage.
STORMWATER MANAGEMENT PERMIT
The written approval granted by the Stormwater Permitting Authority to undertake a construction activity pursuant to a Stormwater Management Permit Application. A valid Stormwater Management Permit must be signed by the Stormwater Permitting Authority participating at a duly noted public hearing, and such permit must be recorded at the Plymouth Registry of Deeds, prior to the start of any work.
STORMWATER PERMITTING AUTHORITY
Organization designated by the Board of Selectmen as responsible for enforcing this Bylaw.
WATERS OF THE COMMONWEALTH
All waters within the jurisdiction of the Commonwealth of Massachusetts, including, without limitation, rivers, streams, lakes, ponds, springs, impoundments, estuaries, wetlands, coastal waters, groundwaters, and vernal pools.
WETLAND RESOURCE AREAS
Areas specified in the Massachusetts Wetlands Protection Act Regulations, 310 CMR 10.00, as amended, and in the Town of Abington Wetland Bylaw, as amended.[1]
[1]
Editor's Note: See Ch. 171, Wetlands Protection.
No person may undertake a construction activity, including clearing, grading, or excavation that results in a land disturbance to an area equal to or greater than one acre of land or will disturb less than one acre of land but is part of a larger common plan of development or sale that will ultimately disturb an area equal to or greater than one acre of land within the Town of Abington without first obtaining a Stormwater Management Permit issued by the Stormwater Permitting Authority (SWPA).
This Bylaw is adopted under authority granted by the Home Rule Amendment of the Massachusetts Constitution, the Home Rule statutes, G.L. c. 83, §§ 1, 10, and 16, as amended by St. 2004, c. 149, §§ 135-140, and pursuant to the Regulations of the federal Clean Water Act found at 40 CFR 122.34.
A. 
The Board of Selectmen shall be the appointing authority for the SWPA. The SWPA is responsible for the administration, implementation, and enforcement of this Bylaw. The SWPA shall consist of five members, whom shall permanently be the Director of Public Works, the Planning Board Chairman, the Conservation Commission Chairman, the Health Agent, and the Building Commissioner. The SWPA shall administer, implement, and enforce this Bylaw. Any powers granted to or duties imposed upon the SWPA may be delegated, in writing, by the SWPA to any Town employee, board, or agent.
B. 
The SWPA shall take any of the following actions as a result of an application for a Stormwater Management Permit as specifically defined within the Stormwater Management Rules and Regulations promulgated as a result of this Bylaw: Approval, Approval with Conditions, or Disapproval.
The Planning Board may adopt, and periodically amend, the Stormwater Management Rules and Regulations relating to the terms, conditions, definitions, enforcement, fees (including application, inspection, and/or consultant fees), procedures and administration of this Bylaw by majority vote of the Planning Board, after conducting one advertised public hearing to receive comments on any proposed revisions. The hearings shall be duly advertised in a paper of general circulation in the Town of Abington no less than 14 days prior to the date of the public hearing. Failure by the Planning Board to promulgate such rules and regulations or a legal declaration of their invalidity by a court shall not act to suspend or invalidate the effect of this Bylaw.
At the applicant's expense, the SWPA may retain independent consultants as needed to review applications for Stormwater Management Permit and to advise the Board on any and all aspects of a specific project. Independent consultants may include but are not limited to registered professional engineers and environmental site monitors.
A. 
The following activities are exempt from requirements under this Bylaw:
(1) 
Normal maintenance and improvement of land in agricultural use as defined by the Wetlands Protection Act regulation 310 CMR 10.04, as amended;
(2) 
Maintenance of existing landscaping, gardens, or lawn areas associated with a single-family dwelling;
(3) 
The construction of fencing that will not substantially alter existing terrain or drainage patterns;
(4) 
Normal maintenance and improvements of the Town of Abington publicly owned roadways and associated drainage infrastructure;
(5) 
Construction or maintenance and repair of utility service lines (gas, water, electric, telephone, fire alarms, etc.) other than drainage lines or systems, which will not alter terrain, ground cover, or drainage patterns;
(6) 
Emergency repairs to any stormwater management system or feature that poses a threat to public health or safety, or as deemed necessary by a Town department or board.
(7) 
Repair or upgrade of septic systems when required by the Board of Health for the protection of public health;
(8) 
Any work or projects for which all necessary approvals and permits, including building permits, have been issued before the effective date of this Bylaw;
(9) 
Projects that are wholly subject to jurisdiction under the Wetlands Protection Act and/or the Abington Wetlands Protection Bylaw and demonstrate compliance with the Massachusetts Stormwater Management Policy as reflected in an Order of Conditions issued by the Conservation Commission. A notice of such approval and conditions and a complete copy of the approved stormwater plan and provisions shall be filed with the SWPA before construction begins; and
(10) 
Any construction activity or project requiring approval under the Subdivision Rules and Regulations where the Planning Board has approved a Definitive Subdivision Application and any construction activity requiring site plan review and/or a special permit, provided that the plans include stormwater management provisions and that the activity is in compliance with any additional performance standards contained in the regulations promulgated to implement this Bylaw. A notice of such approval and conditions shall be filed with the SWPA before construction begins.
A. 
The Planning Board or SWPA shall enforce this Bylaw, regulations, orders, violation notices, and enforcement orders, and may pursue all civil and criminal remedies for such violations.
B. 
Civil relief. If a person violates the provisions of this Bylaw, permit, notices, or order issued thereunder, the Planning Board or SWPA may seek injunctive relief in a court of competent jurisdiction restraining the person from activities which would create further violations or compelling the person to perform abatement or remediation of the violation.
C. 
Orders. The Planning Board or SWPA may issue a written order to enforce the provisions of this Bylaw, which may include requirements to:
(1) 
Cease and desist from construction or land disturbing activity until there is compliance with this Bylaw and the Stormwater Management Permit;
(2) 
Repair, maintain, or replace the stormwater management system or portions thereof in accordance with the operation and maintenance plan;
(3) 
Maintain, install, or perform additional erosion and sediment control measures;
(4) 
Perform monitoring, analyses, and reporting;
(5) 
Remediate adverse impact resulting directly or indirectly from malfunction of the stormwater management system or erosion and sediment control system;
(6) 
Cease and desist from unlawful discharges, practices, or operations; and/or
(7) 
Remediate contamination in connection therewith.
D. 
If the Planning Board or SWPA determines that abatement or remediation of adverse impacts is required, the Enforcement Order shall set forth a deadline by which such abatement or remediation must be completed. Said order shall further advise that, should the violator or property owner fail to abate or perform remediation within the specified deadline, the Town of Abington may, at its option, undertake such work, and the property owner shall reimburse the Town's expense.
E. 
Within 30 days after completing all measures necessary to abate the violation, the violator and the property owner shall be notified of the costs incurred by the Town of Abington, including administrative costs. The violator or property owner may file a written protest objecting to the amount or basis of costs with the Planning Board or SWPA within 30 days of receipt of the notification of the costs incurred. If the amount due is not received by the expiration of the time in which to file a protest or within 30 days following a decision of the Planning Board or SWPA affirming or reducing the costs, or from a final decision of a court of competent jurisdiction, the costs shall become a special assessment against the property owner and shall constitute a lien on the owner's property for the amount of said costs. Interest shall begin to accrue on any unpaid costs at the statutory rate provided in G.L. Ch. 59, § 57, after the 31st day at which the costs first become due.
F. 
Criminal Penalty. Any person who violates any provision of this Bylaw, order, or permit issued thereunder, shall be punished by a fine of not more than $300. Each day or part thereof that such violation occurs or continues shall constitute a separate offense.
G. 
Noncriminal Disposition. As an alternative to criminal prosecution or civil action, the Town may elect to utilize the noncriminal disposition procedure set forth in G.L. Ch. 40, section 21D, in which case the Planning Board or SWPA shall be the Authorized Enforcing Agent. The penalty for the first violation shall be $100. The penalty for the second violation shall be $200. The penalty for the third and subsequent violation shall be $300. Each day or part thereof that such violation occurs or continues shall constitute a separate offense.
H. 
Entry to Perform Duties under this Bylaw. To the extent permitted by state law, or if authorized by the owner or other party in control of the property, the SWPA or its Reviewing Agent, officers, and employees may enter upon privately owned property for the purpose of performing their duties under this Bylaw and regulations and may make or cause to be made such examinations, surveys, or sampling as the SWPA deems reasonably necessary.
I. 
Appeals. A decision of the SWPA shall be final. Further relief of a decision by the SWPA made under this Bylaw shall be appealed to the Superior Court in an action filed within 60 days thereof, in accordance with M.G.L. Ch 249 § 4.
J. 
Remedies Not Exclusive. The remedies listed in this Bylaw are not exclusive of any other remedies available under any applicable federal, state, or local law.
A. 
The SWPA may waive strict compliance with any requirement of this Bylaw promulgated hereunder, where:
(1) 
Such action is allowed by federal, state, and local statutes and/or regulations;
(2) 
It is in the public interest;
(3) 
A public safety issue exists; and/or
(4) 
It is consistent with the purpose and intent of this Bylaw.
B. 
Any applicant may submit a written request to be granted such a waiver. Such a request shall be accompanied by an explanation or documentation supporting the waiver request and demonstrating that strict application of this Bylaw does not further the purposes or objectives of this Bylaw. The SWPA may require documentation to be submitted and stamped by a qualified P.E. registered in Massachusetts or a Certified Professional in Erosion and Sediment Control (CPESC).
The SWPA may require the permittee to post before the start of land disturbance or construction activity, a surety bond, irrevocable letter of credit, cash, or other acceptable security. The form of the bond shall be approved by Town counsel and be in an amount deemed sufficient by the SWPA to ensure that the work will be completed in accordance with the permit. If the project is phased, the SWPA may release part of the bond as each phase is completed in compliance with the Stormwater Management Permit but the bond may not be fully released until the SWPA has received the final inspection report as required by the Stormwater Management Rules and Regulations and issued a Certificate of Completion.
If any provision, paragraph, sentence, or clause of this Bylaw shall be held invalid for any reason, all other provisions shall continue in full force and effect.