The Council may require, before approving the final plat, the subdivider to install or furnish adequate bond for the ultimate installation of any or all of the improvements given in this Article
VI.
Street name signs may be required at all street intersections within
or abutting the subdivision. Such signs shall be of a type approved by the
Council and shall be placed in accordance with standards of the city.
[Amended 5-13-1975 by Ord. No. 726]
Streetlighting facilities shall be required. The pole and fixture and
candlepower shall be in accordance with general standards established by the
Council, and the installation shall be subject to approval by the City Electrical
Inspector.
Where a public water supply approved by the City Engineer is reasonably
acceptable, each lot within the subdivision area shall be provided with a
connection thereto. All connections shall be subject to the approval of the
City Engineer.
A. In a proposed subdivision, pending accessibility of a
public water supply, the subdivider may be required to construct wells or
a private water supply system in such a manner that an adequate supply of
potable water will be available to every lot in the subdivision at the time
improvements are erected thereon. The adequacy, healthfulness and potableness
of the water supply shall be subject to the approval of the City Health Department
and State Health Department. The water supply system shall be constructed
under the direction and control of the City Health Department, and all construction
shall be subject to the approval of the City Engineer.
B. Fire hydrants shall be installed in all subdivisions
within reach of a water system. Fire hydrant standards shall be subject to
the approval of the City Fire Department and the City Engineer.
On all plats submitted where suitable existing trees are not retained
in good condition, street trees may be required. Street trees shall be planted
in conformance with a planting plan approved by the Council on all streets.