Scope. Included under this section shall be the furnishing,
excavation, laying, jointing, capping of the end and backfilling for
the construction of the four-inch house-connection pipe in accordance
with the details shown on the plans and the instructions of the pipe
manufacturer. The work shall include all labor, tools, materials and
equipment, including couplings and jointing materials.