Village of Saukville, WI
Ozaukee County
[HISTORY: Adopted by the Village Board of the Village of Saukville 8-16-2005 by Ord. No. 635.[1] Amendments noted where applicable.]
GENERAL REFERENCES
Numbering of buildings — See Ch. 75.
Driveways — See Ch. 90.
Property maintenance — See Ch. 151.
Shoreland-wetland zoning — See Ch. 162.
Subdivision regulations — See Ch. 176.
205a Appendix A 205b Appendix B 205c Appendix C 205d Appendix D 205e Appendix E 205f Appendix F
[1]:
Editor's Note: The Village Board adopted Ord. No. 633 on 7-19-2005 to enact an Interim Zoning Ordinance, effective for two years from enactment unless otherwise extended for one additional year, to preserve the existing zoning in the Town of Cedarburg, Town of Grafton, Town of Port Washington and Town of Saukville. A complete copy of Ord. No. 633 is on file in the Village offices.
Article I Statutory Authority and Purpose

§ 205-1 Authority.

§ 205-2 Purpose.

§ 205-3 Intent.

§ 205-4 Abrogation and greater restrictions.

§ 205-5 Interpretation.

§ 205-6 Severability.

§ 205-7 Warning and disclaimer of liability.

§ 205-8 Repeal.

§ 205-9 Title.

Article II General Provisions

§ 205-10 Jurisdiction.

§ 205-11 Compliance.

§ 205-12 Municipalities and state agencies regulated; exemptions.

§ 205-13 Duties of Zoning Administrator.

§ 205-14 Permits required.

§ 205-15 Certificates of compliance and occupancy required; floodland requirements.

§ 205-16 Conditional use permit required.

§ 205-17 Sign permit required.

§ 205-18 Grading permit required.

§ 205-19 Other permits.

§ 205-20 Site restrictions.

§ 205-21 Use restrictions.

§ 205-21.1 Unique or atypical permanent and temporary use restrictions and development standards.

§ 205-22 Reduction of or joint use of space.

Article III Fees and Penalties

§ 205-23 Permit fees.

§ 205-24 Triple fee.

§ 205-25 Violations.

§ 205-26 Remedial action.

§ 205-27 Penalties.

Article IV Zoning Districts

§ 205-28 Enumeration of districts; boundaries; vacations; annexations.

§ 205-29 Zoning Map.

§ 205-30 A-1 Agricultural District.

§ 205-31 R-1 Single Family Residential District.

§ 205-32 R-2 Single Family Residential District.

§ 205-33 R-3 Single-Family Residential District.

§ 205-34 R-4 Two-Family Residential District.

§ 205-35 R-5 Multifamily Residential District.

§ 205-36 R-C Condominium Residential District.

§ 205-37 B-1 Central Business District.

§ 205-38 B-2 Retail Shopping Center Business District.

§ 205-39 B-3 Office And Professional Business District.

§ 205-40 B-4 Highway Shopping Center Business District.

§ 205-41 B-P Business Park District.

§ 205-42 M-1 Light Manufacturing District.

§ 205-43 M-2 General Manufacturing District.

§ 205-44 I-1 Institutional District.

§ 205-45 P-1 Park District.

§ 205-46 C-1 Conservancy District.

§ 205-47 State Trunk Highway 33 Setback Overlay District.

§ 205-48 (Reserved)

§ 205-49 PUD Planned Unit Development Overlay District.

§ 205-50 TND Traditional Neighborhood Development District.

Article V Conditional Uses

§ 205-51 Permits.

§ 205-52 Application.

§ 205-53 Review and approval.

§ 205-54 Hearings.

§ 205-55 Public and semipublic uses.

§ 205-56 Residential uses.

§ 205-57 Business uses.

§ 205-58 Industrial and agricultural uses.

§ 205-59 Recreational uses.

§ 205-60 Conservancy uses.

§ 205-61 (Reserved)

§ 205-62 Temporary uses.

Article VI Traffic, Loading, Parking and Access

§ 205-63 Traffic visibility.

§ 205-64 Loading requirements.

§ 205-65 Parking requirements.

§ 205-66 Driveways.

§ 205-67 Highway access.

§ 205-68 Parking restrictions.

Article VII Modifications

§ 205-69 Grant by Building Inspector.

§ 205-70 Heights.

§ 205-71 Yards.

§ 205-72 Additions.

§ 205-73 Average street yards.

§ 205-74 Corner lots.

§ 205-75 Double frontage lot.

§ 205-76 Existing substandard lots.

Article VIII Signs

§ 205-77 Purpose and intent.

§ 205-78 Compliance required.

§ 205-79 Signs permitted without permit.

§ 205-80 Signs permitted residential districts with permit.

§ 205-81 Signs permitted in business and manufacturing districts with permit.

§ 205-82 Signs permitted in institutional and park districts with permit.

§ 205-83 Portable signs.

§ 205-84 Facing residences.

§ 205-85 Construction, design and maintenance standards.

§ 205-86 Existing signs.

§ 205-87 Sign permit.

§ 205-88 Measuring signs.

Article IX Nonconforming Uses, Structures and Lots

§ 205-89 Existing nonconforming uses.

§ 205-90 Abolishment or replacement of nonconforming use.

§ 205-91 Existing nonconforming structures.

§ 205-92 Changes and substitutions.

§ 205-93 Wetland nonconforming uses.

§ 205-94 (Reserved)

Article X Site Plan Review and Architectural Control

§ 205-95 Purpose and intent.

§ 205-96 Principles.

§ 205-97 Required plan data.

§ 205-98 Review of plans; findings.

§ 205-99 Time schedules; sureties.

§ 205-100 Appeals.

§ 205-101 Approval expiration.

Article XI Performance Standards

§ 205-102 Compliance required.

§ 205-103 Air pollution.

§ 205-104 Fire and explosive hazards

§ 205-105 Glare and heat.

§ 205-106 Water quality protection.

§ 205-107 Noise.

§ 205-108 Odors.

§ 205-109 Radioactivity and electrical disturbances.

§ 205-110 Vibration.

§ 205-111 Lighting.

Article XII Construction Site Erosion Control

§ 205-112 Authority.

§ 205-113 Findings of fact.

§ 205-114 Purpose.

§ 205-115 Applicability and jurisdiction.

§ 205-116 Definitions.

§ 205-117 Technical standards.

§ 205-118 Performance standards.

§ 205-118.1 Permitting requirements, procedures and fees.

§ 205-118.2 Erosion and sediment control plan; statement; amendments.

§ 205-118.3 Fee schedule.

§ 205-118.4 Inspection.

§ 205-118.5 Enforcement; violations and penalties.

§ 205-118.6 Appeals.

Article XIII Post-construction Stormwater Management

§ 205-119 Authority.

§ 205-119.1 Findings of fact.

§ 205-119.2 Purpose and intent.

§ 205-119.3 Applicability and jurisdiction.

§ 205-119.4 Definitions.

§ 205-119.5 Technical standards.

§ 205-119.6 Performance standards.

§ 205-119.7 Permitting requirements, procedures and fees.

§ 205-119.8 Stormwater management plan.

§ 205-119.9 Maintenance agreement.

§ 205-119.10 Financial guarantee.

§ 205-119.11 Fee schedule.

§ 205-119.12 Enforcement; violations and penalties.

§ 205-119.13 Appeals.

Article XIV Board of Zoning Appeals

§ 205-120 Establishment.

§ 205-121 Membership; terms; officers; oaths; vacancies.

§ 205-122 Organization; rules of procedure.

§ 205-123 Powers.

§ 205-124 Appeals and applications.

§ 205-125 Hearings.

§ 205-126 Notice to DNR.

§ 205-127 Findings for grant of permit.

§ 205-128 Special exceptions.

§ 205-129 Wetland and floodland mapping disputes.

§ 205-130 Decisions.

§ 205-131 Review by court of record.

Article XV Changes and Amendments

§ 205-132 Authority.

§ 205-133 Initiation.

§ 205-134 Petitions.

§ 205-135 Review and recommendations.

§ 205-136 Hearings.

§ 205-137 Action by Village Board.

§ 205-138 Floodland District boundary changes limited.

§ 205-139 Shoreland C-1 amendments.

§ 205-140 Protest.

Article XVI Public Hearings

§ 205-141 Notices.

Article XVII Definitions

§ 205-142 General word usage.

§ 205-143 Specific terms defined.

Article XVIII Adoption and Effective Date

§ 205-144 Plan Commission recommendation.

§ 205-145 Public hearing.

§ 205-146 Village Board approval.

§ 205-147 When effective.

Article XIX Floodland Zoning

§ 205-148 Statutory authorization, finding of fact, statement of purpose, title and general provisions.

§ 205-149 General provisions.

§ 205-150 General development standards.

§ 205-151 General standards applicable to all floodplain districts.

§ 205-152 Floodway District (FW).

§ 205-153 Floodfringe District (FF).

§ 205-154 General Floodplain District (GFP).

§ 205-155 Nonconforming uses.

§ 205-156 Administration.

§ 205-157 Zoning agency.

§ 205-158 Floodproofing.

§ 205-159 Public information.

§ 205-160 Amendments.

§ 205-161 Enforcement and penalties.

§ 205-162 Definitions.