It shall be unlawful for any person to tear
up, dig into, break up, displace or excavate any of the existing curbs
for the purpose of installing driveways in the Township without first
obtaining a permit therefor from the Construction Official. A separate
permit will be required for each opening made. The permit shall state
the location and approximate size of the opening to be made. No permit
shall be deemed to authorize anything not stated in the permit.
The work on any opening to be made for driveways
to be installed under such permit shall be commenced within 10 days
from the date of such permit and the work prosecuted with due diligence
to its completion. If for any reason work is not commenced within
such ten-day period, the permit shall be void unless within such ten-day
period the applicant shall present the permit to the Construction
Official, who shall extend the time for the beginning of such work
for another period of 10 days by endorsement on the permit. No permit
so extended shall be valid unless the work thereunder shall commence
within 10 days from the date of such endorsement.
The driveways to be installed shall be in strict
accordance with the provisions of this article and the Plan of Standard
Driveways on file in the office of the Township Clerk which is hereby
incorporated by reference as a part of this article. A copy of such
plan is available for inspection and review by the public in the office
of the Construction Official.
There shall be no variance from the plan on
file with the Township Clerk unless application has been made and
approved by the Zoning Board of Adjustment.