Zoning permits shall hereinafter be secured
from the Zoning Officer prior to construction, erection or alteration
of any structure or part of a structure or use of a structure or land.
All requests for zoning permits shall be made, in writing, by the
owner or his authorized agent and shall include the following:
A. A statement of the use or intended use of the building
or structure or land;
B. Two copies of a sealed survey plan showing thereon
the exact size, shape and location of all proposed structures and
all existing structures, metes and bounds description, showing dimensions,
bearings, etc., the location of the required building envelope, any
easements or other restrictions from the approved subdivision, the
proposed setbacks from all property lines for the proposed dwelling
unit, garage, deck, etc., and such other information as may be necessary
to provide for the enforcement of this chapter;
C. Written verification that all federal, state, county
and local agency permits and approvals except for the construction
permit required for the construction, erection or alteration of such
structure or the use of the building or structure or land have been
obtained; and
D. Written verification issued by the Township Tax Collector
stating that all real property taxes and sewer assessments chargeable
to the property or properties for which such application is being
made, except for taxes and assessments which are not yet due and payable
on the date such application is received by the Zoning Officer, are
paid in full and that written verification that sewer connection permit(s)
has (have) been received. No zoning permit shall be issued by the
Zoning Officer unless and until all real property taxes and sewer
assessments and all fines and penalties chargeable to the property
or properties for which such permit is sought have been paid in full.