Construction of new developments, with streets, roads
and rights-of-way leading to or from existing traffic ways which are
under construction or being completed, must be properly surveyed and
with signs posted, by the developer, prior to occupancy.
This survey and posting of signs shall consist of
the erection of stop, yield, one-way, speed limit and any other traffic
signs that are proper for the area, after a survey conducted by a
qualified engineering firm. This will be accomplished prior to any
certificate of occupancy being issued.