[Amended 10-19-1978 by Ord. No. 10-78]
Prior to the granting of final approval, the applicant shall have complied with or shall have furnished performance guaranties for the ultimate compliance with the following:
B.
Topsoil protection. No topsoil shall be removed from the site or used as spoil. Topsoil moved during the course of construction shall be redistributed so as to cover the clear areas of the subdivision and shall be stabilized by seeding or planting.
C.
Monuments. Monuments shall be installed in accordance with applicable municipal, county and state laws or regulations.
D.
Water systems, culverts, storm sewers and sanitary sewers or systems and dry sewers and fire protection. All installations of water systems and dry sewers shall be properly connected with an approved system and shall be adequate to handle all present and probable future development or, in the case of dry sewers, capable of being connected with a public sewage disposal system should one become available. Fire protection shall be adequate to handle all present and probable future development.
[Amended 6-19-1986 by Ord. No. 8-86; 6-20-1991 by Ord. No. 9-91]
F.
Soil erosion and sediment control measures. All construction grading shall be done in such a manner as to prevent the erosion of soil or the collection of sediment and shall conform to the applicant's soil erosion and sediment control plan as filed with and approved by the Borough of Kinnelon Construction Official.
[Amended 5-18-1978 by Ord. No. 3-78]
G.
The applicant shall not disturb the land prior to being granted a valid land disturbance permit by the Borough of Kinnelon Construction Official, which permit shall be granted only after compliance with the provisions of the Borough of Kinnelon Soil Erosion and Sediment Control Ordinance.
[Amended 5-18-1978 by Ord. No. 3-78]
H.
The removal of any tree over four inches in diameter must be approved by the Planning Board. Soil removal and/or backfilling shall not be permitted within six feet of any tree not approved for removal, unless brick or stone retaining wells are constructed in accordance with the Standards for Soil Erosion and Sediment Control in New Jersey, prepared by the New Jersey Soil Conservation Committee, as per the latest edition.
I.
Existing natural streams and watercourses which traverse the subdivision shall not be encroached upon or altered unless approved by the New Jersey Water Policy and Supply Council and then only at the discretion of the Planning Board. If the encroachment does not fall under the jurisdiction of the New Jersey Water Policy and Supply Council, approval shall be subject to the discretion of the Planning Board.