[Amended 7-18-2001 by Ord. No. 19-01]
A. Zoning permits. No use and occupancy of any building, structure, or lot shall be commenced or changed, and no building or structure shall be erected, constructed, reconstructed, altered, convened, or installed, and no building permit or certificate of occupancy shall issue for any one or more of the above activities, until a zoning permit has been issued by the Zoning Officer confirming that such activity complies with all applicable provisions of this chapter and Chapter
95, Zoning, of the Code of the Township of Morris. A zoning permit application for an accessory building or structure (including a fence or wall) on a single-family lot in a residential zone shall be accompanied by a survey of the lot which accurately represents all existing conditions on the lot and a scaled map or drawing showing the location, size and type of the proposed accessory building or structure (including fences and/or walls). (This scaled map or drawing need not be prepared by a licensed professional and may be superimposed upon a copy of the survey.)
[Amended 12-6-2006 by Ord. No. 28-06]
B. Site plan approval. No building permit or zoning permit shall issue for any use or change of use, or for the erection, construction, reconstruction, alteration, conversion, or installation of any building or structure, until a site plan for such activity is first submitted to and approved by the Planning Board, unless such activity is exempt from site plan review under §
57-96 below. No housing unit approved as an age-restricted housing unit in the PRC Zone shall be converted to a non-age-restricted housing unit until a site plan approving such conversion is submitted to and approved by the Planning Board.
[Amended 6-17-2009 by Ord. No. 9-09]
C. Conditions for issuance of certificate of occupancy. No certificate of occupancy shall be issued for any building, structure, lot or use unless all construction and conditions conform to the approved site plan therefor; provided, however, that where the public health, safety and welfare will not be adversely affected, the Construction Official may, in his or her discretion, issue a temporary certificate of occupancy where seasonal weather conditions require delay of installation of landscaping, or the final surface course of any parking or other paved area, or any similar site improvement.