No building permit shall be issued for the construction of any new dwelling
or any existing building to be renovated or converted into a dwelling in the
Village until reasonable satisfactory proof has been furnished to the Building
Inspector that the facility or system for the disposal of sewage or other
putrescent organic wastes for said dwelling will properly operate and function
in consideration of the actual soil and topographic conditions existing at
the location where said facility or system is to be installed.
Plans for the proposed sewage disposal system, prepared by a duly licensed
professional engineer, shall be submitted to the Building Inspector, who shall
review and approve the same only after he has personally inspected the soil
conditions and has observed appropriate percolation tests at the exact location
of the proposed system.
The Building Inspector shall, during the course of construction of the
sewage disposal system, make necessary inspections to ensure that said system
is constructed (and the excavations are backfilled) in accordance with the
approved plan.
No certificate of occupancy shall be issued for any such dwelling until
the Building Inspector receives satisfactory proof that said system is constructed
in accordance with the approved plan.