[HISTORY: Adopted by the Board of Trustees of the Village of Cove Neck 10-18-1974 by L.L. No. 2-1974 as Art. 26 of the 1974 General Code. Amendments noted where applicable.]
GENERAL REFERENCES
Building construction — See Ch. 32.
Excavation, filling and topsoil removal — See Ch. 60.
Subdivision of land — See Ch. 145.
No building permit shall be issued for the construction of any new dwelling or any existing building to be renovated or converted into a dwelling in the Village until reasonable satisfactory proof has been furnished to the Building Inspector that the facility or system for the disposal of sewage or other putrescent organic wastes for said dwelling will properly operate and function in consideration of the actual soil and topographic conditions existing at the location where said facility or system is to be installed.
Plans for the proposed sewage disposal system, prepared by a duly licensed professional engineer, shall be submitted to the Building Inspector, who shall review and approve the same only after he has personally inspected the soil conditions and has observed appropriate percolation tests at the exact location of the proposed system.
The Building Inspector shall, during the course of construction of the sewage disposal system, make necessary inspections to ensure that said system is constructed (and the excavations are backfilled) in accordance with the approved plan.
No certificate of occupancy shall be issued for any such dwelling until the Building Inspector receives satisfactory proof that said system is constructed in accordance with the approved plan.