The fees required by this chapter are the Township review fees.
The Township review fees shall be established by the Township to defray
review costs incurred by the Township and the Township Engineer. All
fees shall be paid by the applicant.
The Township shall establish a review fee schedule by resolution
of the Township governing body based on the size of the regulated
activity and based on the Township's costs for reviewing SWM site
plans. The Township shall periodically update the review fee schedule
to ensure that review costs are adequately reimbursed.
The fees required by this chapter shall, at a minimum, cover:
B. The review of the SWM site plan by the Township and the Township
Engineer;
D. The inspection of stormwater management facilities and drainage improvements
during construction;
E. The final inspection upon completion of the stormwater management
facilities and drainage improvements presented in the SWM site plan;
F. Any additional work required to enforce any permit provisions regulated
by this chapter, correct violations, and assure proper completion
of stipulated remedial actions;