Where an improved property at the time connection to a sewer is required
shall be served by its own sewage disposal system or device, the existing
structure sewer line shall be broken at the structure line and attachment
shall be made with proper fittings to continue such existing structure sewer
line as a building sewer.
No building sewer shall be covered until it has been inspected and approved
by this borough and the Authority. If any part of a building sewer is covered
before so being inspected and approved, it shall be uncovered for inspection
at the cost and expense of the owner of the improved property to be connected
to a sewer.
Every building sewer of any improved property shall be maintained in
a sanitary and safe operating condition by the owner of such improved property.
Every excavation for a building sewer shall be guarded adequately with
barricades and lights to protect all persons from damage and injury. Streets,
sidewalks and other public property disturbed in the course of installation
of a building sewer shall be restored at the cost and expense of the owner
of the improved property being connected, in a manner satisfactory to the
borough.
If any person shall fail or refuse, upon receipt of a notice from this
borough or the Authority, in writing, to remedy any unsatisfactory condition
with respect to a building sewer within 60 days of receipt of such notice,
the borough or the Authority may refuse to permit such person to discharge
sewage and industrial wastes into the sewer system until such unsatisfactory
condition shall have been remedied to the satisfaction of the borough and
the Authority.
The borough reserves the right to adopt, from time to time, additional
rules and regulations as it shall deem necessary and proper relating to connections
with a sewer and the sewer system, which additional rules and regulations,
to the extent appropriate shall be and shall be construed as part of this
chapter.