The fee required by this part is the Township
review fee. The Township review fee shall be established by the Township
to defray review costs incurred by the Township and the Township Engineer.
All fees shall be paid by the applicant.
The Township shall establish a review fee schedule
by separate resolution of the Township governing body based on the
size of the regulated activity and based on the Township's costs for
reviewing drainage plans. The Township may periodically update the
review fee schedule to ensure that review costs are adequately reimbursed.
The fees required by this part shall, at a minimum,
cover:
B. The review of the drainage plan by the Township and
the Township Engineer.
D. The inspection of stormwater management facilities
and drainage improvements during construction.
E. The final inspection upon completion of the stormwater
management facilities and drainage improvements presented in the drainage
plan.
Applicant will be invoiced for any additional
costs incurred by the Township in the course of reviewing the development
plan. These costs may include, but are not limited to, special studies
by qualified engineers, geotechnical engineers, or surveyors, field
reconnaissance, and testing.