Skip to content
home Home
code Code
Code
law Laws (1)
New Laws (1)
Law Ledger (0)
help_center Help
Help
About Us
ecode
Login
Township of Radnor, PA chevron_right chevron_right The Code chevron_right Part II: General Legislation chevron_right Chapter 245 Stormwater Management

Chapter 245 Stormwater Management

[HISTORY: Adopted by the Board of Commissioners of the Township of Radnor 9-12-2022 by Ord. No. 2022-15.[1] Amendments noted where applicable.]
ATTACHMENTS
Attachment 1 - Appendix A District Watershed MapAttachment 2 - Appendix B Simplified Approach to Stormwater Management for Small ProjectsAttachment 3 - Appendix C Sample SWM Site Plan Application and ChecklistAttachment 4 - Appendix E Low Impact Development PracticesAttachment 5 - Appendix F Stormwater Management Design CriteriaAttachment 6 - Appendix G ReferencesAttachment 7 - Appendix H West Nile Virus GuidanceAttachment 8 - Appendix I Stormwater Controls and Best Management Practices Operations and Maintenance AgreementAttachment 9 - Appendix J Riparian Buffer Trail Guidelines
[1]
Editor's Note: This ordinance also repealed former Ch. 245, Stormwater Management, adopted 5-9-2005 by Ord. No. 2005-11, as amended.
Article I General Provisions
§ 245-1 Short title.
§ 245-2 Statement of findings.
§ 245-3 Purpose.
§ 245-4 Statutory authority.
§ 245-5 Applicability/regulated activities.
§ 245-6 Exemptions.
§ 245-7 Repealer.
§ 245-8 Severability.
§ 245-9 Compatibility with other ordinances or legal requirements.
§ 245-10 Erroneous permit.
§ 245-11 Waivers.
Article II Definitions
§ 245-12 Interpretation.
§ 245-13 Definitions.
Article III Stormwater Management
§ 245-14 General requirements.
§ 245-15 Permit requirements by other governmental entities.
§ 245-16 Erosion and sediment control during regulated earth disturbance activities.
§ 245-17 Nonstructural project design process (sequencing to minimize stormwater impacts).
§ 245-18 Infiltration volume requirements.
§ 245-19 Water quality requirements.
§ 245-20 Stream bank erosion requirements.
§ 245-21 Stormwater peak rate control.
§ 245-22 Calculation methodology.
§ 245-23 Other requirements.
§ 245-24 Riparian buffers.
Article IV Stormwater Management (SWM) Site Plan Requirements
§ 245-25 General requirements.
§ 245-26 SWM site plan contents.
§ 245-27 Plan submission.
§ 245-28 Stormwater management (SWM) site plan review.
§ 245-29 Revision of plans.
§ 245-30 Resubmission of inconsistent or noncompliant SWM site plans.
Article V Inspections
§ 245-31 Inspections.
§ 245-32 As-built plans, completion certificate, and final inspections.
Article VI Fees and Expenses
§ 245-33 Municipality SWM site plan review and inspection fee.
§ 245-34 Expenses covered by fees.
Article VII Operation and Maintenance (O&M) Responsibilities and Easements
§ 245-35 Performance guarantee.
§ 245-36 Responsibilities for operations and maintenance (O&M) of stormwater controls and BMPs.
§ 245-37 Municipal review of a stormwater control and BMP operations and maintenance plan.
§ 245-38 Adherence to an approved stormwater control and BMP operations and maintenance plan.
§ 245-39 Operations and maintenance agreement for privately owned stormwater controls and BMPs.
§ 245-40 Stormwater management easements.
§ 245-41 Recording of an approved stormwater control and BMP operations and maintenance plan and related agreements.
§ 245-42 (Reserved)
Article VIII Prohibitions
§ 245-43 Prohibited discharges.
§ 245-44 Prohibited connections.
§ 245-45 Pet waste.
§ 245-46 Roof drains and sump pumps.
§ 245-47 Alteration of BMPs.
§ 245-47.1 Pool water discharges.
Article IX Enforcement and Penalties
§ 245-48 Right-of-entry.
§ 245-49 Public nuisance.
§ 245-50 Enforcement generally.
§ 245-51 Suspension and revocation of permits and approvals.
§ 245-52 Penalties.
§ 245-53 Notification.
§ 245-54 Enforcement.
§ 245-55 Appeals.
By using eCode360 you agree to be legally bound by the Terms of Use and Privacy Policy.
eCode360: Get a Professional Subscription