Fees have been established by the Township to defray plan review
and construction inspection costs incurred by the Township. All fees
shall be paid by the applicant at the time of SWM site plan submission
in accordance with the Township's current fee resolution. The
Township shall periodically update the review and inspection fee schedule
to ensure that review costs are adequately reimbursed.
The fees required by this chapter shall at a minimum cover:
B. The review of the SWM site plan by the Township and the Municipal
Engineer.
D. The inspection of stormwater management facilities and drainage improvements
during construction.
F. The final inspection upon completion of the stormwater management
facilities and drainage improvements presented in the SWM site plan.
G. Any additional work required to enforce any permit provisions regulated
by this chapter, correct violations, and assure proper completion
of stipulated remedial actions.