The site plan for a PUD shall not be less than
15 acres for a residential development, three acres for a commercial
development or five acres for an industrial development; provided,
however, that where an applicant can demonstrate that the characteristics
of his holdings will meet the objectives of this article, projects
with less acreage will be considered; and further provided that in
the event that the Town Board is considering a project with less acreage,
the affirmative vote of not less than 4/5 of the members of the Town
Board shall be required to establish such a PUD. The calculation of
such land area shall not include existing streets, easements, parks
or otherwise dedicated land or water areas in excess of 5% of the
minimum gross acreage, lands officially designated on the official
map of the Town or county as they may be prepared for public purposes
or lands undevelopable by reason of topography, drainage or adverse
subsoil conditions. Sites proposed for development for two or more
classifications shall consist of the aggregate gross land area required
for each use. The proposed development shall conform to the Town of
Saratoga Comprehensive Land Use Plan.
[Amended 5-14-2007 by L.L. No. 1-2007]
The applicant will be responsible to reimburse
the Town for any engineering or legal expenses that are incurred to
evaluate the plans and documentation for the PUD. At the time that
the preliminary plat is submitted to the Board secretary, the applicant
shall establish an escrow in the amount of $3,000 to cover these costs.
All costs of reviewing the application by the Town Counsel, the Town
Engineer, and/or an engineering consultant retained by the Planning
Board will be charged against this account. The account shall be administered
through the Supervisor's office. A positive balance must be maintained
in the account until the project receives final approval and is filed
with the County Clerk's office. If at any time the cost of the review
exceeds the funds available, the applicant will be advised and the
review stopped until the escrow is renewed. All funds remaining in
the account at the time that the subdivision is filed at the county
will be returned to the applicant.
As used in this article, the following terms
shall have the meanings indicated:
COMMERCIAL DEVELOPMENT
Includes uses involving, the sale or rental or distribution
of goods, services, or commodities, either retail or wholesale, or
provision of recreation facilities or activities for a fee.
INDUSTRIAL DEVELOPMENT
Includes uses engaged in production from previously prepared
materials, finished products or parts, including the processing, fabrication,
assembly, packaging, incidental storage, sale, and distribution of
such products. In no case would such uses emit objectionable levels
of smoke, noise, dust, odor, glare, or vibration beyond their property
boundaries.
PUD
A rezoning of a single parcel or multiple contiguous parcels
of land to allow for the development of residential, commercial, and/or
industrial uses either single or jointly in accordance with a comprehensive
development plan submitted by a petitioner.
RESIDENTIAL DEVELOPMENT
The construction of facilities for human habitation in accordance
with all applicable state and local building and sanitary codes. It
may include but is not limited to one-family detached or attached
structures and multiple units within a single structure offered for
sale or rent.