[Amended 10-20-1980 by Ord. No. 37-80; 11-15-1982 by Ord. No. 24-82]
A.
Completion of improvements.
[Amended 11-18-1991 by Ord. No. 36-91]
(1)
Following preliminary approval, but prior to final subdivision approval, the subdivider may elect to install all improvements as required by the Planning Board, under the supervision and inspection of the Township Engineer, or he may post a performance guaranty to assure the installation of any or all required improvements as hereinafter provided and install any required improvements not covered by the performance guaranty.
(2)
Following installation of improvements and/or posting of performance guaranties as provided above, the subdivider shall be entitled to file the final subdivision plat upon receipt of final subdivision approval; however, no construction permits shall be issued in the subdivision or section thereof for which final approval was obtained until the complete installation of all required improvements, including the filing with the Township Engineer of all as-built plans and profiles of all utilities, including stormwater management facilities, with a certification as to the actual construction, except the following:
[Amended 4-15-2002 by Ord. No. 14-02[1]]
(a)
The final bituminous surface course of streets;
(b)
Sidewalks;
(d)
Monuments;
(e)
Shade trees;
(f)
Detention basin landscaping;
[1]
Editor's Note: This ordinance also provided that any subdivision which received preliminary subdivision approval prior to the effective date of this ordinance shall be exempt from the provisions of this ordinance.
(3)
All improvements covered by the performance guaranties shall be completed within two years of final approval unless an extension of time is granted by the Township Committee and shall be completed to the satisfaction of the Township Engineer prior to the issuance of the last 10% percent (rounded up to the next whole numeral) of certificates of occupancy for the subdivision.
[Amended 4-15-2002 by Ord. No. 14-02[3]]
[3]
Editor's Note: This ordinance also provided that any subdivision which received preliminary subdivision approval prior to the effective date of this ordinance shall be exempt from the provisions of this ordinance.
(4)
If the subdivider elects to post performance guarantees pursuant to this section, the final plat shall contain the following statement in bold letters:
[Amended 6-21-1999 by Ord. No. 14-99; 2-27-2003 by Ord. No. 3-03]
NOTICE CONSTRUCTION OF ALL REQUIRED IMPROVEMENTS IS TO BE COMPLETED WITHIN TWO YEARS OF FINAL APPROVAL UNLESS AN EXTENSION OF TIME HAS BEEN OBTAINED FROM THE TOWNSHIP COMMITTEE. THE MUNICIPALITY HAS NO OBLIGATION TO CONSTRUCT ANY IMPROVEMENTS NOT COMMENCED, NOR TO COMPLETE ANY IMPROVEMENTS COMMENCED BY DEVELOPER EXCEPT TO THE EXTENT OF FUNDS RECEIVED FROM THE PERFORMANCE GUARANTEES POSTED BY DEVELOPER WITH THE MUNICIPALITY. NO BUILDING PERMITS SHALL BE ISSUED UNTIL COMPLETION OF ALL REQUIRED IMPROVEMENTS WITH THE EXCEPTION OF THOSE SET FORTH IN § 175-31A(2). |
B.
To assure the repair and/or correction of certain installed improvements during the period of construction prior to Township acceptance, the Planning Board may require a performance guaranty in an amount equal to 10% of the value of such installed improvements. Pavement, curbing, drainage and items shown on the plans or required by ordinance which have been installed during said construction period may be subject to this requirement.
C.
The performance guaranty to be furnished shall comply with the requirements of this chapter and of the Municipal Land Use Law, N.J.S.A. 40:55D-1 et seq.
[Amended 2-19-1990 by Ord. No. 6-90[4]]
D.
The following construction standards and improvements are necessary to protect the health, safety, welfare and convenience of the residents and public as well as needed to meet local, county, regional, state and national goals and objectives. It is recognized, however, that in peculiar situations, all of the improvements listed below may not be appropriate or needed. These items may then be waived in accordance with § 175-8.
E.
To assure the repair and/or correction of certain installed improvements during the period of construction prior to Township acceptance, the Planning Board may require a performance guaranty in an amount equal to 10% of the value of such installed improvements. Pavement, curbing, drainage and items shown on the plans or required by ordinance which have been installed during said construction period may be subject to this requirement.
F.
The performance guaranty to be furnished shall comply with the requirements of this chapter and of the Municipal Land Use Law, N.J.S.A. 40:55D-1 et seq.
[Amended 2-19-1990 by Ord. No. 6-90]
G.
The following construction standards and improvements are necessary to protect the health, safety, welfare and convenience of the residents and public as well as needed to meet local, county, regional, state and national goals and objectives. It is recognized, however, that in peculiar situations, all of the improvements listed below may not be appropriate or needed. These items may then be waived in accordance with § 175-8.