[Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. I)]
As a condition of approval and the continuance of any use, occupancy of any structure and operation of any process or equipment, the applicant shall supply evidence, satisfactory to the Land Use Board or to its designated representative, that the proposed use, structure, process or equipment will conform fully to all of the applicable performance standards. As evidence of compliance, the Board may require certification of tests by appropriate government agencies or by recognized testing laboratories, any costs thereof to be borne by the applicant. The Land Use Board may require that specific types of equipment, machinery or devices be installed or that specific operating procedures or methods be followed if the government agencies or testing laboratories examining the proposed operation shall determine that the use of such specific types of machinery, equipment, devices, procedures or methods are required in order to assure compliance with the applicable performance standards. Permits and certificates required by other government agencies shall be submitted to the Land Use Board as proof of compliance with applicable codes for special exception uses, or for use variances which must meet these performance standards.