This work shall consist of clearing the ground within the street limits and other designated areas of trees, stumps, brush, rubbish and all objectionable material in accordance with these specifications. This work shall also include the clearing of the ground necessary for the construction and installation of drainage structures, ditches, channels, fences and other appurtenances. Included in this work shall be the preservation from injury or defacement of vegetation and objects designated to remain.
The removal or destruction of material growths shall be limited to that which is necessary to provide working room for the construction operations and future maintenance requirements.
A. 
Within the excavation lines all trees shall be cut off and stumps removed to a depth of not less than 12 inches below the graded surface.
B. 
Within the fill lines where an embankment is to be made not more than five feet in depth, trees, stumps, roots, etc., shall be removed. Where the embankments to be made exceed five feet in depth, trees, stumps, roots, etc., shall be cut off to within six inches of the ground surface.
C. 
Outside of the roadway and in areas where clearing is necessary for the construction and installation of various highway appurtenances, all trees and stumps shall be cut flush with the ground and all dead or uprooted trees, brush, roots or otherwise objectionable material shall be removed as directed unless otherwise indicated on the plans.
D. 
All trees that are cut shall be removed from within the limits of the highway, at the earliest possible moment, before the grading is started. All elm wood cut shall be burned by the contractor.
E. 
All branches of trees extending within the roadway shall be trimmed as directed to provide a minimum vertical clearance of 16 feet, including selective trimming of such trees as directed.
F. 
The contractor shall dispose of all such trees, stumps, brush, etc., in a satisfactory manner and shall remove all rubbish and refuse from within the highway limits.
G. 
All excavations made below subgrade surface by the removal of trees, stumps, etc., shall be filled with suitable material, which shall be compacted thoroughly in accordance with the provisions governing formation of embankments.
H. 
All fences, railings, stone wall fences and ornamental and utilitarian domestic accessories, such as but not limited to garden pools, arbors, fireplaces, sheds and incinerators, within the highway limits shall be removed as directed.
I. 
All ditches, waterways, drainage structures and culverts constructed under the contract shall be cleaned and cleared of obstructions in a satisfactory manner and shall be left in a neat and trimmed condition. When directed by the Engineer, all existing ditches, waterways, drainage structures and culverts shall be cleaned of obstructions resulting from construction operations.
J. 
Any burning of cleared material on the site shall be done only with written permission of the proper local authorities.