Each applicant who files an application before
the Elk Township Planning Board shall pay the applicable application
fee listed below for such application. The application fee provided
for herein shall be nonrefundable and is required for purposes of
offsetting the administrative and clerical costs of operating the
Planning Board and for costs which may be incurred by the Planning
Board in the normal processing of such applications (exclusive of
the legal, planning, engineering and other professional services deemed
necessary by the Planning Board).
The following is a schedule of fees to be paid
by the applicant upon filing the application:
A. Schedule of subdivision and site plan fees.
(1) Minor subdivision:
[Amended 3-6-2003 by Ord. No. O-1-2003; 9-4-2003 by Ord. No. O-14-2003; 3-16-2004 by Ord. No. O-2004-2; 8-21-2007 by Ord. No. O-2007-11; 4-3-2008 by Ord. No. O-2008-3]
(b)
Initial escrow fee deposit: $1,500.
(2) Preliminary major subdivision:
(b)
Engineer review: $1,000, plus $50 per lot created.
(d)
Planning review:
[1]
Residential: $500, plus $10 per lot.
[2]
Nonresidential: $500, plus $100 per acre or
a portion thereof.
(3) Final major subdivision:
(b)
Engineer review: $800, plus $50 per each lot
created.
(d)
Planning review:
[1]
Residential: $200, plus $10 per lot.
[2]
Nonresidential: $300, plus $100 per acre or
portion thereof.
(4) Planned unit development:
(b)
Master development plan approval:
[2]
Engineer review: $1,500, plus $40 each unit
and $40 per acre nonresidential.
[4]
Planning review: $1,000, plus $40 each unit
and $40 per acre nonresidential.
(c)
Site plan/subdivision plat:
[2]
Engineer review: $2,500, plus $40 each unit
or acre.
[4]
Planning review: $1,000, plus $40 each unit
or acre.
(5) Minor site plan:
(b)
Engineer review: $500, plus $100 per each acre
over one acre or portion thereof.
(c)
Planning review: $500, plus $50 per each acre
over one acre or portion thereof.
(6) Preliminary major site plan:
(b)
Engineer review: $900, plus $200 each acre over
one or $500, plus $100 per lot (whichever is greater).
(d)
Planning review:
[1]
Residential: $600, plus $50 for each lot or
unit, whichever is greater.
[2]
Nonresidential: $800, plus $100 per each acre
over one.
(7) Final major site plan:
(b)
Engineering review: $600, plus $50 each acre
over one.
(c)
Planning review: $500, plus $50 each acre over
one.
(e)
Legal review: $300.
[Added 4-3-2008 by Ord. No. O-2008-3]
B. Use variance fees (applications made under N.J.S.A.
40:55D-70d):
[Amended 7-3-2003 by Ord. No. O-8-2003; amended 9-4-2003 by Ord. No. O-14-2003; 4-3-2008 by Ord. No. O-2008-3; 6-5-2009 by Ord. No. O-2009-5]
|
Type
|
Fee
|
---|
|
Application fee
|
$200
|
|
Initial escrow fee deposit
|
$2,500
|
|
Publication fee
|
$25
|
C. Bulk variance fees (application made under N.J.S.A.
40:55D-70c):
[Amended 7-3-2003 by Ord. No. O-8-2003; 9-4-2003 by Ord. No. O-14-2003; 4-3-2008 by Ord. No. O-2008-3; 6-5-2009 by Ord. No. O-2009-5]
|
Type
|
Fee
|
---|
|
Application fee
|
$200
|
|
Initial escrow fee deposit
|
$1,500
|
|
Publication fee
|
$25
|
D. Appeals (applications made under N.J.S.A. 40:55D-70a):
[Amended 6-5-2009 by Ord.
No. O-2009-5]
|
Type
|
Fee
|
---|
|
Application fee
|
$200
|
|
Initial escrow fee deposit
|
$1,500
|
|
Publication fee
|
$25
|
E. Interpretation (applications made under N.J.S.A. 40:55D-70b):
[Amended 6-5-2009 by Ord.
No. O-2009-5]
|
Type
|
Fee
|
---|
|
Application fee
|
$100
|
|
Initial escrow fee deposit
|
$500
|
F. Administrative
nonsubstantial design change request:
[Added 6-5-2009 by Ord.
No. O-2009-5]
|
Type
|
Fee
|
---|
|
Application fee
|
$100
|
|
Initial escrow fee deposit
|
$500
|
|
Publication fee
|
$25
|
G. Miscellaneous (i.e., informal review):
[Amended 6-5-2009 by Ord.
No. O-2009-5]
|
Type
|
Fee
|
---|
|
Application fee
|
$100
|
|
Initial escrow fee deposit
|
$500
|
|
Publication fee
|
$25
|
H. Applications for vacation of streets. Engineering
review: $500.
[Added 12-21-2004 by Ord. No. O-2004-10]
I. Zoning permits. Zoning permits shall hereafter be
secured from the Zoning Office prior to the issuance of a building
permit or upon a change in the use of a structure or land. Each application
shall be accompanied by a fee of $50.
[Added 5-5-2005 by Ord. No. O-2005-3]
[Adopted 12-18-2018 by Ord. No. O-11-2018]