These regulations are adopted and implemented
to achieve the following general purposes and objectives:
A. To manage stormwater runoff resulting from land alteration
and disturbance activities in accordance with the watershed stormwater
management plans adopted by Allegheny County as required by the Pennsylvania
Stormwater Management Act (Act 167 of 1978, as amended).
B. To utilize and preserve the desirable existing natural
drainage systems and to preserve the flood-carrying capacity of streams.
C. To encourage natural infiltration of rainfall to preserve
groundwater supplies and streamflows.
D. To provide for adequate maintenance of all permanent
stormwater management facilities in the municipality.
The provisions of this article shall apply to
all subdivisions and land developments unless specifically exempted
or otherwise modified herein.
Upon recording of the final plat, the applicant may commence to install or implement the approved stormwater management controls, subject to the provisions of §
185-43B, above. If site development or building construction does not begin within 18 months of the date of the final approval of the plan, then before doing so, the applicant shall resubmit the stormwater management plans to verify that no condition has changed within the watershed that would affect the feasibility or effectiveness of the previously approved stormwater management controls. Furthermore, if for any reason development activities are suspended for 18 months or more, then the same requirement for resubmission of the stormwater management plan shall apply. The terms of these subsequent reviews shall be subject to the provisions of Article
IV of this chapter.
Requests for modifications of the final approved
stormwater management controls shall be submitted to the Township
Engineer as follows:
A. If the request is initiated before construction begins, the stormwater plan must be resubmitted and reviewed according to the procedures in §
185-43 of this article.
B. If the request is initiated after construction is underway, the Township Engineer shall have the authority to approve or disapprove the modification, based on field inspection, provided that the requested changes in stormwater controls do not result in any modifications to other approved Township land use/development requirements (such as required building setbacks, yards, etc.). A plan modification, in accordance with applicable Township procedures, shall be necessary if any such requirements are affected. The Township Engineer shall submit a record of all approved changes for the stormwater management controls to the Township prior to the acceptance of any improvements by the Township. Modifications must not affect the compliance of the plan with the performance standards as set forth in Article
VII of this chapter and Sections 709 and 1003 of the West Deer Zoning Ordinance.