If during construction, the contractor or permittee
identifies any site condition, such as subsurface soil conditions,
alterations in surface or subsurface drainage which could affect the
feasibility of the approved stormwater facilities, he/she shall notify
the Municipal Engineer within 24 hours of the discovery of such condition
and request a field inspection. The Municipal Engineer shall determine
if the condition requires a stormwater plan modification.