When requested by the Town Engineer, a user must submit information
on the nature and characteristics of its wastewater within 30 days
of the request. The Town Engineer is authorized to prepare a form
for this purpose and may periodically require users to update this
information.
All existing users connected to or contributing to the Town's
wastewater facilities shall apply for a wastewater discharge permit
within 180 days after notification by the Town Engineer. After review
and evaluation of the industrial user's application, the Town may
issue that user a wastewater discharge permit. At a minimum, all significant
industrial users, all industrial users hauling or generating hauled
wastewater introduced to the Town's POTW and spill potential users
shall be issued permits.
All new industrial users proposing to connect to or to contribute
to the Town's wastewater facilities shall apply for a wastewater discharge
permit before connecting to or contributing to these facilities.
All wastewater discharge permit applications and user reports
must be signed by an authorized representative of the user and contain
the following certification statement:
|
"I certify under penalty of law that this document and all attachments
were prepared under my direction or supervision in accordance with
a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted
is, to the best of my knowledge and belief, true, accurate and complete.
I am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment for
knowing violations."
|
The Town Engineer will evaluate the data furnished by the user
and may require additional information. Within 14 days of receipt
of a complete wastewater discharge permit application, the Town Engineer
will determine whether or not to issue a wastewater discharge permit.
The Town Engineer may deny any application for a wastewater discharge
permit. Any denial or approval will be given in writing to the applicant.