A.
No person shall excavate, drill or remove soil on any lot, or caused to be excavated, drilled or have soil removed on such lot, for the purpose of installing a private well upon any lot within the Borough, unless and until a permit therefor shall have first been issued by the approving authority.
B.
Such permit shall be applied for on forms to be supplied by the Borough Construction Office and which shall be issued in accordance with the Uniform Construction Code, as adopted in accordance with Chapter 140 of this Code.
C.
As part of such application, no permit shall be granted for the drilling of any private well unless the permit is approved in advance by the Board of Public Works of Park Ridge.