A. 
The Township Engineer or the Township assignee shall inspect all phases of the installation of the permanent stormwater management/BMP facilities with all cost being the responsibility of the applicant.
B. 
During any stage of the work, if the Township Engineer determines that the permanent stormwater management facilities are not being installed in accordance with this chapter, the Township shall revoke any existing permits until the field conditions are brought into conformity with the approved drainage plan or a revised drainage plan is submitted and approved, as specified in this chapter.