The prime contractor shall assure that all construction site waste is controlled in such a manner as to prevent dispersion of waste materials during any phase of construction.
Collection containers or vehicles will be located on all construction sites for the disposal of waste construction materials and other debris. A sufficient number of containers or vehicles will be available to adequately serve each individual site.
The prime contractor shall be responsible for the prompt removal from paved streets or roadways of earth or other material which has been transported thereto by trucks or earthmoving equipment or erosion by water.
A. 
Water or suitable chemicals shall be used for the control of dust during the demolition of existing buildings or structures.
B. 
The application of water or suitable chemicals shall be used on dirt roads and material stockpiles during road grading and construction and on other surfaces for the control of airborne dusts.