The prime contractor shall assure that all construction site
waste is controlled in such a manner as to prevent dispersion of waste
materials during any phase of construction.
Collection containers or vehicles will be located on all construction
sites for the disposal of waste construction materials and other debris.
A sufficient number of containers or vehicles will be available to
adequately serve each individual site.
The prime contractor shall be responsible for the prompt removal
from paved streets or roadways of earth or other material which has
been transported thereto by trucks or earthmoving equipment or erosion
by water.