Regular inspections shall be made and documented for each ESD planning
technique and practice at the stages of construction specified in
the Design Manual by the Town, its authorized representative, or certified
by a professional engineer licensed in the State of Maryland. At a
minimum, all ESD and other nonstructural practices shall be inspected
upon completion of final grading, the establishment of permanent stabilization,
and before issuance of use and occupancy approval.