Skip to content
home Home
code Code
Code
law Laws (1)
New Laws (1)
Law Ledger (0)
help_center Help
Help
About Us
ecode
Login
Village of Sleepy Hollow, NY chevron_right chevron_right Part II: General Legislation chevron_right Chapter 190 Excavation, Filling and Topsoil Removal

Chapter 190 Excavation, Filling and Topsoil Removal

[HISTORY: Adopted by the Board of Trustees of the Village of Sleepy Hollow 8-8-2006 by L.L. No. 3-2006 (Ch. 17B of the 1965 Code). Amendments noted where applicable.]
GENERAL REFERENCES
Building construction — See Ch. 145.
Demolition of buildings — See Ch. 148.
Explosives and blasting — See Ch. 193.
Fees — See Ch. 200.
Property maintenance — See Ch. 310.
Stormwater management and erosion and sediment control — See Ch. 358.
Wetlands and watercourses — See Ch. 418.
Subdivision of land — See Ch. 425.
Zoning — See Ch. 450.
Article I General Provisions
§ 190-1 Findings and intent.
§ 190-2 Definitions.
Article II Excavation, Tree Removal or Topsoil Stripping Permits
§ 190-3 Permit required.
§ 190-4 Application for permit.
§ 190-5 Fees.
§ 190-6 Bond or cash deposit.
§ 190-7 Release or forfeiture of bond or deposit.
§ 190-8 Permit conditions.
§ 190-9 Duration of permit.
§ 190-10 Minor excavations.
Article III Permits for Nonremoval of Fill or Filling Operations
§ 190-11 Permit required.
§ 190-12 Application for permit.
§ 190-13 Minor excavation or fill permit.
§ 190-14 Fee.
§ 190-15 Bond or cash deposit release.
§ 190-16 Permit conditions.
§ 190-17 Duration of permit.
Article IV Commercial Excavations
§ 190-18 Permit required; conditions.
Article V Enforcement
§ 190-19 Protection of adjoining property.
§ 190-20 Powers of Building Inspector.
§ 190-21 Penalties for offenses.
By using eCode360 you agree to be legally bound by the Terms of Use and Privacy Policy.
eCode360: Get a Professional Subscription