The size, slope, alignment, and materials of construction of a building
sewer; the methods used in excavating, pipe laying, jointing, testing,
and backfilling; and the connection of the building sewer to the public
sewer shall all conform to the requirements of the building and plumbing
codes and other applicable rules and regulations of the Town as specified
in the permit application.