A traffic study shall be required when the development site
is:
|
Table 6.03.01
Minimum Driveway and Access Standards
| |
---|---|
Driveway width (one-way, minimum)
|
12 to 16 feet
|
Drive width (two-way, minimum)
|
24 feet
|
Number of driveways for each property:
|
Not more than 2 in the first 100 feet of frontage and one per
additional 100 feet of frontage.
|
Distance between driveways (measured from the two closest driveway
curb cuts, minimum)
|
30 feet
|
Distance of a driveway from a street intersection (measured
from the intersection of the street ROW to the nearest end of the
curb radius, minimum)
|
30 feet
|
Distance from the end of the driveway curb cut to the nearest
crosswalk (minimum)
|
10 feet
|
Curb radius of all driveways
|
5 to 15 feet
|
Angle between the curbline of a street and the center line of
a driveway (minimum)
|
60°
|
The required high-quality materials shall at a minimum extend from ground level to the top of the first floor windows with minor accents allowed. The use of materials not included in the list of high-quality materials set forth in this Section 6.04(3)b on more than 25% of a building elevation will be allowed only upon issuance of a special use permit issued pursuant to Section 5.17 of this Zoning Ordinance.
|
Type of Development
|
Minimum IES* Illumination Level
(FC)
|
Maximum IES* Illumination Level
(FC)
|
Maximum to Minimum Ratio
|
Average to Maximum Ratio
| |
---|---|---|---|---|---|
Multifamily residential
|
0.1
|
1.5
|
15.0:1
|
4:1
| |
Commercial
|
0.2
|
2.1
|
10.5:1
|
3:1
| |
Industrial
|
0.2
|
3.0
|
15.0:1
|
4:1
| |
Institutional
|
0.2
|
2.1
|
10.5:1
|
3:1
|
* Illuminating Engineering Society
|