A. Building permit fees. Administrative fee shall be $15 for each application.
(1) Construction, reconstruction or alteration.
(a) One- and two-family construction, reconstruction or alteration: $15
per thousand of total cost. The minimum fee is $40 plus administrative
fee.
(b) All other construction, reconstruction or alteration: $17 per thousand
of total cost. The minimum fee is $120 plus administrative fee
(2) Mechanical and sheet metal.
(a) One- and two-family mechanical and sheet metal: $15 per thousand
of total cost. The minimum fee is $40 plus administrative fee.
(b) All other mechanical and sheet metal: $17 per thousand of total cost.
The minimum fee is $120 plus administrative fee.
(3) For demolition of a structure: $200.
(4) For the moving of a structure: $150.
(5) Erect sign, banner, and awnings: $50 base plus $6 per $100 of cost.
(6) For the installation of a tank for the resale or storage, use, and
distribution of any fluid other than water (does not include tanks
installed in dwellings for storage of oil for domestic use): $75.
(7) Certificate of occupancy: $100.
(8) Temporary certificate of occupancy (monthly): $50.
(10)
Reinspection fee, payable in advance: $50.
(12)
Work started without a permit: triple fee of total cost.
(13)
Removal of illegal work: $300.
(14)
After-hours inspections: $400 for the first two hours, $100
for every additional hour.
(15)
Permit extension: thirty-day extension $50.
B. Electrical fees.
(1) Administration fee of $15 for each application.
(a)
New single- and two-family, up to 200 amps per unit, flat fee:
$300.
(b)
New apartment or condo, per unit: $150.
(3) Outlets.
(a)
Receptacles, switches, outlets (each): $2.
(4) Fixtures/exit signs.
(b)
Ceiling suspension fans (each): $5.
(c)
Exit/emergency lighting (each): $2.
(5) Telephone/data (each): communications systems.
(a)
Sound or signals (per outlet residential): $3.
(b)
Public address (PA) systems, speakers, etc.
[1]
Telephone, data, cable, etc. (each):
(6) Motors.
(a)
Under one hp (each): $25.
(b)
One to five hp motors (each): $30.
(c)
Six to 25 hp motors (each): $40.
(d)
Maximum fee above 25 hp (each): $50.
(7) Appliance (ranges, dryers, dishwasher, micro, disposal, etc., each):
$10.
(9) Services.
(a)
Each 100 amp, one meter one panel: $100.
(b)
Each additional 100, or fraction: $10.
(c)
Each additional meter, panel: $20.
(g)
Reattach service (vinyl siding): $30.
(10)
Electric signs and tubs.
(a)
Electric signs/indoor and outdoor installation: $50.
(b)
Hydromassage bathtub (jacuzzi): $10.
(12)
HVAC:
(c)
HVAC commercial [i.e., freezer, chess, etc. (each)]: $75.
(13)
Miscellaneous.
(a)
Gas/oil boiler (each): $30. An additional plumbing permit and
either a gas or oil permit are required for this installation.
(b)
Gas/oil furnace (each): $30. An additional mechanical permit
and either a gas or oil permit are required for this installation.
(14)
Pools.
(c)
Heat unit (per unit): $50.
(15)
Alarm systems.
(a)
Fire/burglar panel only: $50.
(b)
Smoke detectors, heat detectors, pull station, horns/audible,
sprinkler controls, etc. (each): $3.
(c)
Minimum fee for installations not listed: $50.
(17)
Removal of illegal work: $300.
(18)
Installation not listed: $50.
(19)
Working without a permit: triple fee.
(20)
After-hours inspections: $400 for the first two hours, $100
for every additional hour.
C. Plumbing fees.
(1) Administration fee of $15 for each application.
(2) New plumbing/residential.
(a)
New single-family home: $300.
(b)
New multi-dwelling unit (per unit): $200.
(c)
Additional fixtures, each: $8.
(3) Remodeling/residential.
(a)
First four fixtures: $75.
(b)
Each additional fixture: $10.
(4) Commercial new/remodel.
(a)
First four fixtures: $100.
(b)
Each additional fixture: $20.
(5) Water heater:
(a)
Gas/electric (residential): $40.
(b)
Gas/electric (commercial): $60.
(9) Alterations/repairs, system: $8.
(10)
Backflow prevention devices:
(11)
Demolition fee (cap off water and sewer): $50.
(12)
Work started without permit or without inspector's approval:
triple fee.
(13)
Removal of illegal work: $300.
(15)
After-hours inspections: $400 for the first two hours, $100
for every additional hour.
D. Gas fees. Gas fees listed in this schedule are for both new work
and renovations. Administration fee of $15 for each application.
(2) Residential (up to three dwelling units):
(b)
Each additional fixture or appliance: $10.
(c)
New apartment or condo (per unit): $100.
(3) Commercial:
(a)
First four appliances: $100.
(b)
Each additional appliance: $20.
(6) Work started without permit or without inspector's approval: triple
fee.
(7) Removal of illegal work: $300.
(8) After-hours inspections: $400 for the first two hours, $100 for every
additional hour.
[Amended 8-21-2017 by Ord. No. 2018-4]
The Code Enforcement Inspector, although now under the direction
and control of the Director of Inspectional Services, shall continue
to act as an agent of the Public Health Department to the extent that:
A. He/she must, by statute, code or ordinance, perform certain functions
as agent of the Public Health Department;
B. He/she is needed to perform his/her former duties; and
C. His/her power to make inspection for and complaint of violations
of any ordinance, code or law relative to the public health is dependent
upon such an agency relationship.
State law references — Authority
of inspector of buildings, MGL c. 40A, § 7; designation
of inspector of buildings, MGL c. 143, § 3.
|