[Ord. 2002-01, 2/7/2002, § 701]
1.
Building Permits. Where required by the Manheim Township Building Permit Ordinance [Chapter 4] for the erection, enlargement, repair, alteration, moving or demolition of any structure, a building permit must be obtained from the Code Enforcement/Zoning Officer. A building permit expires one year from the date of issuance. The permit application must be accompanied by the site plan showing, as necessary, to demonstrate conformity to this chapter:
A.
Lot: the location and dimensions of the lot.
B.
Streets: names and widths of abutting streets and highways.
C.
Structures and yards: locations, dimensions and uses of existing and proposed structures and yards on the lot and, as practical, of any existing structures within 100 feet of the proposed structure but off the lot.
D.
Improvements: proposed off-street parking and loading areas, access drives and walks; proposed sewage disposal system.
2.
Zoning Permits. A zoning permit shall be obtained from the Zoning Officer (i) for any erection, construction, alteration, extension, replacement, relocation or conversion of any building or structure and (ii) for the change in use of any building, structure, sign and/or land and (iii) for the excavation, grading of or earthmoving activities on any property in preparation for the erection of a structure or change in use of a property. No zoning permit shall be required for repairs to or maintenance of any building, structure or land, provided such repairs do not change the use, alter the exterior dimensions of the building or structure or otherwise violate the provisions of this chapter or any other applicable Township or county ordinance or applicable statute or regulation.
3.
Use Certificates. A use certificate, certifying compliance with this chapter, must be obtained from the Code Enforcement/Zoning Officer for any new structure, as below, or for any change of use of a structure or land, as set forth below, before such new structure or use or change of use is occupied or established:
A.
Use of a structure erected, structurally altered or extended, or moved after the effective date.
B.
Use of vacant land except for agricultural purposes.
C.
Any change in a nonconforming use of a structure or land.
D.
Any change from a nonconforming use of a structure or land to a conforming use.
E.
Any change in the use of a structure or land from that permitted by any variance of the Zoning Hearing Board.
The application for a use certificate must include a statement of the intended use and any existing use of the structure or land. The certificate continues in effect as long as the use of the structure or land for which it is granted conforms to this chapter. |