[Amended 5-4-1978 by Ord. No. 190; 6-6-1985 by Ord. No. 271; 7-2-1985 by Ord. No. 272; 6-1-1989 by Ord. No. 332; 7-6-1989 by Ord. No. 333; 8-1-1991 by Ord. No. 380; 2-2-1995 by Ord. No. 429; 3-20-1997 by Ord. No. 465; 3-15-2007 by Ord. No. 585; 7-21-2011 by Ord. No. 676; 10-16-2014 by Ord. No. 718; 12-30-2015 by Ord. No. 735]
The fee for a construction permit shall be the sum of the subcode fees listed in Subsections A through G as set forth herein below.
State Uniform Construction Code enforcing agency.
Construction permits fees. The fee for a construction permit shall be the sum of the basic construction fee plus all applicable special fees, and shall be paid before the permit is issued. Each fee shall be rounded up to the nearest dollar.
A. Plan review fee. The fee for a plan review shall be 20% of the construction permit fee.
B. Training and certification fees. The Department of Community Affairs training and certification fees shall be established by the State of New Jersey under the authority of the New Jersey Administrative Code to be computed on a per cubic foot volume for new buildings and additions and for all other construction shall be computed on a dollar amount per $1,000 of value of construction.
C. Building subcode fees. The building subcode fee shall be:
(1) New construction.
(a) The fee for new construction shall be $0.034 per cubic foot of volume for buildings and structures, except see Subsection
C(1)(b).
(b) The fee for new construction with unfinished interiors totaling 50,000 cubic feet of volume shall be $0.018 per cubic foot of volume for the first 50,000 cubic feet and $0.015 for the remaining cubic feet, with a minimum fee of $82.
(2) Exceptions:
(a) For renovation, alterations and repairs, $35 for the first $1,000 of estimated cost and $25 per $1,000 or fraction thereafter.
(b) Manufactured homes. In accordance with N.J.A.C. 5:23-4.18(c), there are no fees for the factory-built portion of the home. The fee shall be $100 per $1,000 of the estimated cost of site construction associated with the installation of the manufactured home.
(c) Farm use buildings exclusively used for agriculture purposes on agricultural assessed land pursuant to N.J.A.C. 5:23-3. The fee shall be $0.010 per cubic foot of volume of the building or structure, with a maximum fee of $1,443 per structure.
[Amended 4-20-2017 by Ord. No. 756]
(3) Combination of renovations and additions. The amount shall be the sum of the fees computed separately as renovations and additions.
(4) Demolition. Permit fees for demolition of buildings shall be as follows:
| Type of Building | Flat Fee |
|---|
| Single-family dwelling | $80 |
| Garage | $80 |
| Other use group | $150 |
(5) Special permits.
(a) Swimming pools.
[1] The fee for an aboveground swimming pool shall be $125 for a pool with a surface area greater than 550 square feet; the fee in all other cases shall be $65.
[2] The fee for an in-ground swimming pool shall be $190 for a pool.
(b) The permit fee for a permit to construct and install a sign shall be $4 per square foot, provided that the minimum fee shall be $70. In the case of double-faced signs, the area of the surface of only one side of the sign shall be used for purposes of the fee computation.
[Amended 4-20-2017 by Ord. No. 756]
(c) Certificate of occupancy:
[2] Residential additions: $55.
[3] Residential storage buildings over 300 square feet: $55.
[4] All other use groups: $75, granted pursuant to a change of use $150.
(d) Certificate of continued occupancy:
[2] All other use groups: $75.
(e) Relocate building or structure to new location, flat fee of $300. This subsection is applicable to structures exceeding 300 square feet, plus applicable special fees.
(f) Reinstatement of permit, $50 applicable after one year of issuance date plus volume increase if applicable at time of reinstatement.
(g) Lead abatement fees: for permit, $100; and for clearance certificate, $175.
(h) Asbestos abatement: $175 for permit; and $50 for clearance certificate.
(i) Application for a variation for all use groups: $750.
(j) Roofing permits and siding permits: $35 for the first $1,000 and $25 for each additional $1,000.
(k) The fee for a temporary certificate of occupancy is $35, with a fee of $30 for each extension.
(6) The minimum construction subcode fee shall be $70.
D. Plumbing subcode fees shall be:
(1) Fixtures and appliances connected to the plumbing system (as listed) and gas piping systems, including, but not limited to:
| Fixture or Appliance | Fee (each) |
|---|
| Water closet/bidet/urinals | $15 |
| Bathtub | $15 |
| Lavatory/sink | $15 |
| Shower/Floor drain | $15 |
| Washing machine | $15 |
| Dishwasher | $15 |
| Commercial dishwasher | $15 |
| Hose bibs | $15 |
| Water cooler | $15 |
| Garbage disposal | $15 |
| Indirect connection | $15 |
| Vent stack | $15 |
| A/C condensate drains | $15 |
(2) Special devices (as listed):
| Type of Device | Fee (each) |
|---|
| Grease traps | $90 |
| Oil separators | $90 |
| Water-cooled air conditioners | $90 |
| Refrigerator units | $90 |
| Water heater | $90 |
| Water utility connection | $90 |
| Sewer utility connection | $90 |
| Backflow preventors subject to testing | $90 |
| | (All others, when not part of fire suppression system) | $15 |
| Steam boilers | $90 |
| Hot water boilers | $90 |
| Gas piping/gas service entrance | $90 |
| Active solar systems | $90 |
| Sewer pumps | $90 |
| Interceptors | $90 |
| Fuel oil piping | $90 |
| Gasoline product piping | $90 |
| Sump pumps | $90 |
| Booster pumps | $90 |
| L.P. cylinders | $90 |
(3) The minimum plumbing subcode fee shall be $70.
E. Electrical subcode fees shall be:
(1) Total number of electric fixtures and devices; this includes fixtures, switches, lighting, alarms, detectors, communication points, solar panels:
| Number of Fixtures | Fee |
|---|
| 1 to 50 | $50 |
| For each additional 25 | $25 |
(2) For each motor, generator or transformer based on KW or HP, including residential appliances, the fees shall be:
| Number of KW/HP | Fee (each) |
|---|
| 1 to 10 | $20 |
| 11 to 50 | $60 |
| 51 to 100 | $120 |
| 101 to 999 | $300 |
| 1,000 or greater | $600 |
(3) Services, disconnect fees shall be:
| Number of Amps | Fee |
|---|
| 30 to 200 | $60 |
| 201 to 600 | $120 |
| 601 to 1,000 | $200 |
| > 1,000 | $300 |
(6) The electrical subcode fee for swimming pools:
(a) Aboveground pool, with or without lights: $60
(b) In-ground pool, with or without lights: $150
(c) Yearly public pool inspections: $100
(7) The minimum electrical subcode fee shall be $70.
(8) Commercial solar PV installations.
| Number of KW | Fee |
|---|
| 1 to 50 | $150 |
| 51 to 100 | $200 |
| 100 to 1,000 | $600 |
| > 1,000 | $1,000 |
| Plus associated panels, disconnects, and solar panels |
(9) Residential solar PV installations: flat fee of $350
F. The elevator fees shall be per state fees.
G. Fire subcode fees shall be:
(1) Sprinkler system fees:
| Number of Heads or Type of System | Fee |
|---|
| First 20 heads | $80 |
| 21 to 100 heads | $140 |
| 101 to 200 heads | $280 |
| 201 to 400 heads | $600 |
| 401 to 1,000 heads | $1,000 |
| > 1,000 heads | $1,200 |
| Standpipe system | $100 |
| Fire pump | $100 |
(2) Special suppression systems:
| System | Fee |
|---|
| Range hoods (first one) | $60 |
| Each additional | $30 |
| Large systems | $230 |
(3) Smoke control systems: $100.
(4) Exit signs, per floor: $30.
(5) Emergency lighting, per floor: $30
(6) Fire alarms:
(b) Each additional 10 devices: $25
(7) Heat-producing devices in new buildings, (fireplaces, wood stoves, furnaces, but not boilers):
(a) One- and two-family (new): $70
(8) Installation of storage tanks: greater than 600 gallons, $200
(9) The minimum fire subcode fee shall be $70.
(10) For any items not listed above, a special fee shall be determined by the Construction Official and the appropriate subcode official.
H. Mechanical inspection fees shall be:
[Added 9-21-2017 by Ord. No. 763]
(1) Mechanical inspection in a structure of Group R-3 or R-5 by a mechanical inspector shall be $70 for the first device and $15 for each additional device. No separate fee shall be charged for gas, fuel, oil or water piping connections associated with the mechanical equipment inspection.