If during construction, the contractor or permittee identifies any
site conditions such as subsurface drainage, which could affect the
feasibility of the approved stormwater facilities, he must notify
the Borough Engineer within 24 hours of the discovery of such condition
and request a field inspection. The Borough Engineer shall determine
if the condition requires a stormwater modification.