[Amended 7-10-2000 by Ord. No. 8-2000[1]]
This article is intended to require a mandatory hookup for buildings or structures located on streets where the municipality's water system is currently constructed; and mandatory hookup for those buildings or structures which are located in the area of any proposed expansion of the municipality's water supply system.