A.
The final plat and supporting drawings and documents for a proposed subdivision constitute the complete development of the subdivision proposal and include the recommendations resulting from the Planning Board review of the preliminary layout as well as the detailed layout drawings for the public improvements and utilities. After public hearing and approval by the Planning Board, this complete submission, along with the performance bond and the provision of the liability insurance policy, as approved by the Village Board, becomes the basis for the construction of the subdivision and the inspection service by the Village Engineer and Planning Board. The plat itself must be recorded at the County Clerk's office to have legal status. An unrecorded plat is not a valid basis for site improvements or other commitments which depend on its design characteristics.
B.
The plat itself shall be an accurate survey record of the properties resulting from the subdivision.