Upon presentation of proper credentials, the Borough may enter
at reasonable times upon any property within the Borough to inspect
the condition of the stormwater structures and facilities in regard
to any aspect regulated by this Part 2.
In the event that a person fails to comply with the requirements
of this Part 2, or fails to conform to the requirements of any permit
issued hereunder, the Borough shall provide written notification of
the violation. Such notification shall set forth the nature of the
violations and establish a time limit for the correction of these
violation(s). Failure to comply within the time specified shall subject
such person to the penalty provisions of this Part 2. All such penalties
shall be deemed cumulative and do not prevent the Borough from pursuing
any and all remedies. It shall be the responsibility of the owner
of the real property on which any regulated activity is proposed to
occur, is occurring, or has occurred to comply with the terms and
conditions of this Part 2.
This Part 2 shall take effect on July 1, 2012.