A.
Land shall be used or occupied and buildings or structures shall be started, reconstructed, enlarged or altered only after a zoning permit has been obtained from the Zoning Administrator.
B.
The Commission may request a review of the zoning permit approved by the Zoning Administrator in order to determine if the contemplated use is in accordance with the district in which the construction lies.
C.
Each application for a zoning permit shall be accompanied by three copies of a scale drawing. The drawing shall show the size and shape of the parcel of land on which the proposed building is to be constructed, the nature of the proposed use of the building or land and the location of such building or use with respect to the property lines of said parcel of land and to the right-of-way of any street or highway adjoining said parcel of land. Any other information which the Zoning Administrator may deem necessary for consideration of the application may be required. In addition, the applicant must produce proof that the structure or use has been approved by all authorities having jurisdiction, including but not limited to the Highway Department, the Health Department and the Wetlands Commission.