The preapplication conference is provided as an informal session to provide information prior to preparation of formal application documentation and shall be optional at the discretion of the subdivider.
A.
Prospective subdividers shall arrange a preapplication conference with the Township Planning Commission to determine the practical and legal feasibility of the proposed project prior to the development of formal preliminary plan preparation. An appointment shall be made at least seven days prior to the Commission's regular meeting date. No fee shall be required for said conference.
B.
Subdividers shall present all information and data, as required by this chapter, for review and discussion with the Planning Commission.
C.
In assessing the suitability of the plan, the Planning Commission shall consider the Township's Comprehensive Plan and any other appropriate plans.
D.
Consideration shall also be given to possible hazards to health, safety and welfare. Land subject to flooding, slides due to soil type or slope or excavation, excessive erosion, improper drainage, mine subsidence problems, or land unsuited for on-site sewage disposal shall be deemed hazardous and shall require a specific demonstration of measures to remove the identified hazard-producing condition.