[Ord. No. 804, 8-1-2002]
Many of the ordinances adopted by the City of Lake Tapawingo
are based on the covenant and restrictions abstracted verbatim from
the original deeds used in the conveyance of all lots and tracts within
the City of Lake Tapawingo. Should any property owner wish to examine
the original, copies thereof are on file with the City at City Hall
and may be inspected at any time during normal business hours.
[Ord. No. 804, 8-1-2002]
The following terms, as used in the Building Codes of the City
of Lake Tapawingo, shall be deemed to have the following meaning:
APPLICANT IN GOOD STANDING
An applicant for a building permit who has paid in full all
current water, sewer and trash obligations to the City of Lake Tapawingo.
FRONT
When used with reference to the boundary lines of lots, the
front end or line thereof shall mean that end or line lying closest
to the body of water known as Lake Tapawingo.
GRANTEE
An owner or owners of any tract of ground lying within the
boundaries of the City of Lake Tapawingo.
LOT
Each lot or tract of land within the boundaries of Lake Tapawingo,
a City in Jackson County, Missouri, as shown by the plat thereof recorded
in the office of the Recorder of Deeds of Jackson County, Missouri
at Independence.
[Ord. No. 804, 8-1-2002; Ord. No. 856 §1, 7-6-2006]
A. The
Building Code Official/Codes Administrator for the City of Lake Tapawingo
is responsible for the interpretation and enforcement of the building
rules, regulations, codes and ordinances for the City of Lake Tapawingo.
The Board of Aldermen shall retain final jurisdiction in the event
of appeals.
B. The
Building Code Official is empowered to require all construction to
comply with all local, State and national building codes, rules and
regulations and the collection of established fees or charges for
the issuance of building permits upon proper inspection, review and
approval of construction plans.
[Ord. No. 804, 8-1-2002; Ord. No. 837, 5-5-2005; Ord. No. 856 §1, 7-6-2006; Ord. No. 860 §1, 10-5-2006]
A. Approval
of construction plans, site surveys, etc., by the Code Official or
his designee is required prior to beginning any construction, alterations
or additions.
B. All
required plans, surveys, specifications, drawings, blueprints and
other required paperwork must be submitted to the City of Lake Tapawingo
for review and approval.
1. Plans must be submitted for all construction in the City of Lake
Tapawingo. Plans and specifications drawn and stamped by a certified
architect and/or engineer shall not be required unless one (1) of
the following conditions applies:
a. Construction is a new, complete home or structure greater than two
hundred (200) square feet in total area;
b. Construction involves the addition of a new level or story to an
existing structure;
c. Construction is an addition to an existing structure and the addition
is greater than two hundred (200) square feet in area;
d. Rock and soil conditions are such that the Code Official deems an
engineering report necessary prior to approval of foundation plans;
e. Construction involves structural support components or load-bearing
walls;
f. The Code Official determines, at his discretion, that certified architect
or engineer stamped plans are necessary.
C. Stake Survey. A stake survey, performed by a surveyor registered
in the State of Missouri, shall be required. In addition to the stake
survey, a plot plan shall be furnished showing the location of the
proposed improvements or additions. The Building Official may waive
the requirement for a stake survey when, in his/her opinion; a stake
survey is obviously not necessary.
D. No
applicant for a building permit shall be entertained unless that applicant
is in good standing with the City of Lake Tapawingo.
E. All
building permits expire ninety (90) days from the date of issuance
if building has not begun. Extensions may be granted upon written
application and show of good cause.
F. The
Code Official may declare any building permit void if a physical inspection
of the property discloses variation from the approved plans or specifications.
[Ord. No. 884 §§1—2, 4-2-2009]
A. The most current edition of the APWA specifications and the MARC BMP manual for stormwater practices are hereby adopted and referred to Chapter
500, Section
500.080 the Lake Tapawingo, Missouri Municipal Code.
B. Should
any provisions of the APWA specifications or the MARC BMP standards
differ from current City Code addressing the same topic, the more
stringent requirements shall prevail.
[Ord. No. 804, 8-1-2002]
Whenever any of the codes or standards adopted by the City of
Lake Tapawingo shall provide an appeal or hearing to a person who
has been denied an application or a permit, or who claims the provisions
of a code do not apply, or that the true intent and meaning of the
code have been misconstrued or wrongly interpreted, or proposes alternate
materials or types of construction not permitted by the strict interpretation
of a code, such application or appeal shall be to the Building Committee
of the City of Lake Tapawingo.
[Ord. No. 804, 8-1-2002; Ord. No. 898 §3, 8-18-2010]
Any person violating any of the provisions of this Chapter or fail to comply therewith or shall violate or fail to comply with any order made thereunder, or who shall build in violation of any detailed statement of specifications or plans submitted and approved thereunder, or any certificate or permit issued thereunder, and from which no appeal has been taken, or who shall fail to comply with such order as affirmed or modified by the City of Lake Tapawingo, within the timeframe fixed herein, shall be subject to the general penalty provisions contained in Section
100.040. Imposition of one (1) penalty for any violation shall not excuse the violation permitted to continue; and all such persons shall be required to correct or remedy such violation or defects within a reasonable time; and when not otherwise specified, each ten (10) days that prohibitive conditions are maintained shall constitute a separate offense.
[Ord. No. 804, 8-1-2002]
All electrical wiring shall conform to the requirements of the
latest edition of the National Electrical Code.