Post-construction stormwater management facilities shall be designed and constructed in accordance with Chapter
388, Stormwater Management, of the Township's Code. The intent of these specifications is to supplement Chapter
388, Stormwater Management; however, if there is a conflict between the requirements of Chapter
388, Stormwater Management, and these specifications, the requirements of the Chapter
388, Stormwater Management, shall prevail.