[Code 1999 §410.170; Ord. No. 479 Art. VIII, 11-9-1995]
Upon the filing of a preliminary plat of a subdivision or any
portion thereof, the subdivider shall pay a preliminary filing fee
of twenty-five dollars ($25.00) payable to the City of Seymour. Upon
the filing of a final plat of the subdivision or any portion thereof,
the subdivider shall pay a filing fee of one hundred dollars ($100.00)
plus ten dollars ($10.00) for each lot or unit shown on the plat.
The fees shall be used to defray the cost of processing and reviewing
such plans.
[Code 1999 §410.180; Ord. No. 479 Art. IX, 11-9-1995]
The Planning and Zoning Commission shall require from a registered
professional engineer a certificate, which is affixed to the final
plat, certifying that the engineer has inspected all of the improvements
installed and that the material contained therein meets the requirements
contained in the plans and specifications approved by the Commission.