[Adopted 12-14-1998 by L.L. No. 7-1998; amended in its entirety 1-25-1999 by L.L. No. 1-1999]
[Amended 3-10-2014 by L.L. No. 3-2014]
Water meter readings will be taken quarterly, or as otherwise
determined by the Village Board, by Village personnel at a time determined
by the Village, or at the discretion of, and under conditions stipulated
by, the Village Board.
No meter seal may be broken or a meter removed without the written
permission of the Village. Any seal broken with permission of the
Village must be resealed by the Village personnel within five days
or the user will be subject to a charge of 1,000 gallons per day usage.
Any user who removes a meter with permission of the Village for construction
or other reasonable purpose shall be billed at the rate of 100 gallons
per day per person in residence for the period the meter is disconnected
to a maximum of one week.