[R.O. 2011 §69.600; Ord. No. 1570 §1, 1-19-1988]
The following words shall have the following definitions:
CUT
To cause the surface of any public way to be disturbed by
cutting, digging or excavating the same.
PUBLIC WAY
Any street, alley or easement owned by the City of Savannah
or dedicated to public use and located within the City of Savannah.
[R.O. 2011 §69.610]
No person shall cut or cause to be cut any public way unless
such person has obtained a permit from the City of Savannah, and posted
a bond or cash deposit as determined by the City Administrator; or
unless said person is acting as an agent for an entity which has a
utility franchise agreement on file with the City of Savannah.
[R.O. 2011 §69.630; Ord. No. 1570 §1, 1-19-1988; Ord. No. 1607 §1, 11-1-1988]
Upon application, the following fee schedule will be followed:
Seventy-five dollars ($75.00) for a street cut half way across
the street.
One hundred fifty dollars ($150.00) for a street cut more than
half way across the street.
Fees will be determined by the Public Works Director. The cut
permit fee will be paid to the City Collector. The City will maintain
street cut after completion of construction.
[R.O. 2011 §69.670]
Any person violating this Article shall, after conviction, be punished as provided in Section
100.220 of the Savannah City Code.