A.
If compliance with the elevation or floodproofing requirements stated above would result in an exceptional hardship for a prospective builder, developer or landowner, the City Building Code Board of Appeals (hereafter known as the "Board") may, upon request, grant relief from the strict application of the requirements. Requests for relief to the strict application of the provisions of this Part 2 and its subsections may be granted by the Board having jurisdiction as noted above and in accordance with the following procedures and criteria:
(1)
No variances shall be granted for any construction, development, use or activity within any AE-designated floodplain area that would, together with all other existing and anticipated development, allow any rise in the BFE.
(2)
Except for a possible modification of the regulatory flood elevation requirement involved, no variance shall be granted for any of the other requirements pertaining specifically to development regulated by floodplain permit (or prohibited activities) or to development which may endanger human life.
(3)
If granted, a variance shall involve only the least modification necessary to provide relief, and in no case shall a variance permit less than 1 1/2 feet of freeboard elevation for any proposed manufactured home, nursing home, hospital, jail, prison or structure used for the storage or production of materials or substances considered dangerous to human life, plant life, animal life or infrastructure.
(4)
In granting any relief, the Board may attach whatever reasonable conditions and safeguards it considers necessary in order to protect the public health, safety and welfare and to achieve the objectives of this Code.
B.
In reviewing any request for relief, the Board of Appeals shall consider, but not be limited to, the following:
(1)
Whether there is good and sufficient cause to grant the variance;
(2)
Whether failure to grant the variance would result in exceptional hardship to the applicant; and
(3)
Whether granting the variance will result in any unacceptable or prohibited flood heights, additional threats to public safety, extraordinary public expense; create nuisances; cause fraud on or victimization of the public; or conflict with any other applicable local ordinances and regulations and with any applicable commonwealth statutes and regulations.
C.
A complete record of all variance requests and related actions shall be maintained by the floodplain administrator. In addition, a report of all variances granted during the year shall be included in the annual report to the Federal Emergency Management Agency.
D.
Notwithstanding any of the above, however, all structures shall be designed and constructed so as to have the capability of resisting the hydrostatic and hydrodynamic loads and pressures and effects of buoyancy of the one-hundred-year flood.