[Added 11-9-2020 by Ord. No. 858
A. The following schedule of fees shall be charged when submitting applications
for the installation of wireless communications facilities (WCF) both
inside and outside the Township rights-of-way:
Facility
|
Fee
|
---|
Tower-based WCF
|
$2,500
|
Nontower WCF
|
$1,000
|
Small WCF (collocated)
|
$500 for up to five small WCFs in a single application, $100
for each additional small WCF thereafter in the same application
|
Small WCF (requiring new wireless support structure)
|
$1,000
|
B. All small wireless communications facilities located within Township
rights-of-way shall pay an annual fee of $270. This fee shall be payable
to the Township on January 1 of each year.
[Amended 2-13-2023 by Ord. No. 888]
A flat fee of $400 shall be charged for the consideration of
any residential application by the Zoning Hearing Board of any matter
authorized by the Zoning Ordinance. A flat fee of $750 shall be charged for the consideration
of any commercial application by the Zoning Hearing Board of any matter
authorized by the Zoning Ordinance. The fee for a continued hearing
is $100.
[Amended 2-13-2023 by Ord. No. 888]
A. A flat fee of $400 shall be charged by Peters Township for the acceptance
of any application for supplemental site plan review by the Peters
Township Planning Commission. Such charge shall include a review for
change in use. If a stormwater management plan is required, there
will be an additional charge of $400. Any amount exceeding $400 for
stormwater review shall be billed to and paid for by the applicant.
B. A flat fee of $700, plus $60 per acre for each acre over one acre,
shall be charged by Peters Township for any application for site plan
review by the Peters Township Planning Commission when no previously
approved site plan is on file with the Township which meets current
ordinance requirements or which involves new building construction.
C. An escrow fee shall be posted for the purpose of offsetting the cost
associated with the engineering review of the site plan, including
any required stormwater management plan. The initial escrow fee shall
be a flat fee of $1,000 plus $250 per acre for each acre over one
acre. Any cost incurred by the Township for the engineering review
exceeding the initial engineering fee shall be invoiced to and paid
by the applicant. No permits of any kind shall be issued to the applicant
if the applicant has an outstanding escrow fee invoice.
D. For any application requiring legal agreements as specified in the
Zoning Ordinance (Chapter 27), a minimum fee of $110 shall be charged by Peters Township.
The minimum fee for the review of legal agreements for condominium
developments and developments of a similar legal nature shall be $400.
Any amount exceeding the minimums shall be billed to and paid by the
developer.
[Amended 2-13-2023 by Ord. No. 888]
A flat fee of $350 shall be charged by Peters Township for the
consideration by the Construction Code Board of Appeals of any matter
authorized by the Uniform Construction Code as adopted by Peters Township.
If the applicant requests a stenographer for a hearing, then the fee
shall be $500.